IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0100 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,250 $6,500 Implemented
MS0100 # 06 Y:1997 06 1997 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $27,581 $3,182 Implemented
OR0310 # 01 Y:1997 01 1997 USE PLASTIC PALLETS INSTEAD OF WOOD $11,530 $1,830 Implemented
OR0310 # 02 Y:1997 02 1997 MOVE PRODUCT USING MECHANICAL MEANS $9,625 $14,810 Not Implemented
OR0310 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $4,309 $2,320 Not Implemented
OR0310 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $2,930 $8,750 Not Implemented
OR0310 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,635 $2,500 Implemented
OR0310 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $169 $670 Implemented
OR0310 # 07 Y:1997 07 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $698 $2,017 Not Implemented
KG0097 # 01 Y:1997 01 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,522 $5,150 n/a
KG0097 # 02 Y:1997 02 1997 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $8,416 $8,894 n/a
KG0097 # 03 Y:1997 03 1997 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $90,970 $800 n/a
KG0097 # 04 Y:1997 04 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $596,163 $8,894 n/a
KG0097 # 05 Y:1997 05 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $30,888 $43,000 n/a
AM0307 # 01 Y:1997 01 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $18,700 $7,500 Not Implemented
AM0307 # 02 Y:1997 02 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $7,900 $750 Implemented
AM0307 # 03 Y:1997 03 1997 OPTIMIZE PLANT POWER FACTOR $6,060 $8,750 Implemented
AM0307 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,540 $7,500 Not Implemented
AM0307 # 05 Y:1997 05 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,045 $200 Implemented
AM0307 # 06 Y:1997 06 1997 OPTIMIZE PLANT POWER FACTOR $1,270 $1,910 Not Implemented
AM0307 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,220 $920 Not Implemented
AM0307 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $485 Implemented
AM0307 # 09 Y:1997 09 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $420 $150 Implemented
AM0307 # 10 Y:1997 10 1997 USE SYNTHETIC LUBRICANT $235 $0 Not Implemented
AM0308 # 01 Y:1997 01 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $39,645 $4,200 Implemented