Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160,809
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1072 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,892 | $12,650 | n/a |
UD1072 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,343 | $1,667 | n/a |
UD1072 # 07 Y:2024 | 07 | 2024 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $14,674 | $67,830 | n/a |
UF0606 # 01 Y:2023 | 01 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $188,564 | $146,067 | n/a |
UF0606 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,322 | $322,608 | n/a |
UF0606 # 03 Y:2023 | 03 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $38,799 | $79,800 | n/a |
UF0606 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $35,430 | $25,350 | n/a |
UF0606 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,283 | $0 | n/a |
UF0606 # 06 Y:2023 | 06 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $214,485 | $60,000 | n/a |
AS0566 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,582 | $284,735 | Implemented |
AS0566 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $1,673 | $3,459 | Implemented |
AS0566 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,411 | $463 | Implemented |
AS0566 # 04 Y:2023 | 04 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $404 | $496 | Implemented |
AS0566 # 05 Y:2023 | 05 | 2023 | REDUCE HEAT GAIN BY WINDOW TINTING | $193 | $667 | Implemented |
AS0566 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $180 | $44 | Not Implemented |
AM0900 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,923 | $10,333 | n/a |
AM0900 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $19,139 | $30,070 | n/a |
AM0900 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,283 | $273 | n/a |
AM0900 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,024 | $546 | n/a |
AM0900 # 05 Y:2024 | 05 | 2024 | USE SYNTHETIC LUBRICANT | $727 | $546 | n/a |
AM0900 # 06 Y:2024 | 06 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,310 | $69,700 | n/a |
AM0901 # 01 Y:2024 | 01 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $16,101 | $4,000 | n/a |
AM0901 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,599 | $3,000 | n/a |
AM0901 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,877 | $327,235 | n/a |
AM0901 # 04 Y:2024 | 04 | 2024 | REDUCE FLUID FLOW RATES | $2,572 | $3,000 | n/a |