IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,184

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0056 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,802 $18,226 Not Implemented
UM0056 # 03 Y:1996 03 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,733 $250 Not Implemented
UM0056 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,725 $200 Not Implemented
UM0056 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $306 $800 Not Implemented
UM0056 # 06 Y:1996 06 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,500 $1,000 Not Implemented
UM0056 # 07 Y:1996 07 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,388 $1,200 Not Implemented
UM0055 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $5,129 $17,603 Not Implemented
UM0055 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,553 $4,800 Not Implemented
UM0055 # 03 Y:1996 03 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,921 $4,266 Not Implemented
UM0055 # 04 Y:1996 04 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,733 $18,000 Not Implemented
UM0055 # 05 Y:1996 05 1996 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $11,025 $680 Not Implemented
UM0054 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,890 $10,080 Not Implemented
UM0054 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,793 $16,153 Not Implemented
UM0054 # 03 Y:1996 03 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,323 $0 Not Implemented
UM0054 # 04 Y:1996 04 1996 USE RADIANT HEATER FOR SPOT HEATING $10,280 $17,000 Not Implemented
UM0054 # 05 Y:1996 05 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,565 $0 Not Implemented
UM0054 # 06 Y:1996 06 1996 MINIMIZE WATER USAGE $2,040 $3,000 Not Implemented
UM0053 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $244 $2,260 Not Implemented
UM0053 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,678 $18,091 Not Implemented
UM0053 # 03 Y:1996 03 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,369 $305 Not Implemented
UM0053 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,341 $1,000 Not Implemented
UM0053 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,611 $350 Not Implemented
UM0053 # 06 Y:1996 06 1996 USE RADIANT HEATER FOR SPOT HEATING $2,480 $5,100 Not Implemented
UM0053 # 07 Y:1996 07 1996 RECOVER AND REUSE WASTE MATERIAL $6,043 $0 Not Implemented
UM0052 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,306 $1,433 Implemented