IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2201 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,612 $675 Implemented
LS2201 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $199 $53 Implemented
LS2201 # 04 Y:2022 04 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $121 $49 Implemented
LS2201 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $482 $240 Not Implemented
LS2201 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $99 $50 Not Implemented
LS2201 # 07 Y:2022 07 2022 USE TANKS WITH A CONICAL BOTTOM OUTLET SECTION TO REDUCE WASTE ASSOCIATED WITH THE INTERFACE OF TWO LIQUIDS $1,451 $1,103 Not Implemented
LS2201 # 08 Y:2022 08 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,305 $31,464 Implemented
LS2201 # 09 Y:2022 09 2022 OPTIMIZE PLANT POWER FACTOR $464 $3,415 Not Implemented
LS2201 # 10 Y:2022 10 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $41,481 $646,020 Not Implemented
AS0514 # 01 Y:2022 01 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $138,858 $8,368 Not Implemented
AS0514 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $10,545 $141,340 Not Implemented
AS0514 # 03 Y:2022 03 2022 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $9,435 $4,628 Not Implemented
AS0514 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,222 $8,635 Not Implemented
AS0514 # 05 Y:2022 05 2022 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $7,266 $30,762 Not Implemented
AS0514 # 06 Y:2022 06 2022 UPGRADE CONTROLS ON COMPRESSORS $3,883 $1,160 Not Implemented
AS0514 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $799 $1,584 Not Implemented
AS0514 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $772 $59 Not Implemented
AS0514 # 09 Y:2022 09 2022 INSTALL OCCUPANCY SENSORS $498 $216 Not Implemented
UU0193 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $269,225 $7,636,800 Implemented
UU0193 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $371,933 $40,000 Implemented
UU0193 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,764 $4,720 Implemented
UU0193 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,736 $1,307 Implemented
UU0193 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,875 $5,000 Implemented
UU0193 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $946 $3,500 Not Implemented
AM0835 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,925 $2,265 Implemented