IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159,297

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0969 # 07 Y:2023 07 2023 PAY UTILITY BILLS ON TIME $419 $200 Implemented
GT0969 # 08 Y:2023 08 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $389 $270 Implemented
GT0969 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,558 $49,875 Implemented
GT0969 # 10 Y:2023 10 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $59,198 $494,048 Not Implemented
UW2309 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,420 $4,240 Implemented
UW2309 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,363 $0 Implemented
UW2309 # 03 Y:2023 03 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,805 $0 Implemented
OR0773 # 01 Y:2023 01 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $5,439 $1,278 Implemented
OR0773 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,051 $797 Implemented
OR0773 # 03 Y:2023 03 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,507 $13,124 Not Implemented
OR0773 # 04 Y:2023 04 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,262 $12,121 Not Implemented
NT0014 # 01 Y:2023 01 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,483 $1,258 Implemented
NT0014 # 02 Y:2023 02 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,006 $6,160 Implemented
NT0014 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $955 $0 Implemented
NT0014 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $2,486 $1,441 Implemented
NT0014 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,512 $0 Implemented
MS0419 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $317 $1,202 n/a
MS0419 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $256 $1,217 n/a
MS0419 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,886 $0 n/a
MS0419 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $47,025 $389,760 n/a
LS2315 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $5,741 $690 Implemented
LS2315 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $127 $100 Not Implemented
LS2315 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,010 $915 Implemented
LS2315 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $118 $190 Implemented
LS2315 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $43,222 $231,000 Not Implemented