Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160,699
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0899 # 01 Y:2024 | 01 | 2024 | MAINTAIN MACHINES TO REDUCE LEAKS | $4,537 | $5,000 | n/a |
AM0899 # 02 Y:2024 | 02 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $711 | $23,638 | n/a |
AM0899 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,352 | $530,400 | n/a |
AM0899 # 04 Y:2024 | 04 | 2024 | REDUCE FLUID FLOW RATES | $1,045 | $3,000 | n/a |
AM0899 # 05 Y:2024 | 05 | 2024 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $254 | $1,314 | n/a |
MI0433 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,476 | $80 | n/a |
MI0433 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,706 | $3,257 | n/a |
MI0433 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,622 | $1,720 | n/a |
MI0433 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $1,297 | $1,752 | n/a |
MI0433 # 05 Y:2023 | 05 | 2023 | PAY UTILITY BILLS ON TIME | $202 | $0 | n/a |
TR0048 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,304 | $43,319 | n/a |
TR0048 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $14,601 | $10,663 | n/a |
TR0048 # 03 Y:2023 | 03 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $27,609 | $2,500 | n/a |
TR0048 # 04 Y:2023 | 04 | 2023 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,211 | $8,620 | n/a |
TR0048 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $116,063 | $1,521,071 | n/a |
TR0048 # 06 Y:2023 | 06 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $6,430 | $15,000 | n/a |
TR0048 # 07 Y:2023 | 07 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $654 | $1,350 | n/a |
UL2314 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $29,804 | $13,936 | n/a |
UL2314 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,821 | $13,461 | n/a |
UL2314 # 03 Y:2023 | 03 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,576 | $15,000 | n/a |
UL2314 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,358 | $0 | n/a |
UL2314 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,061 | $4,320 | n/a |
UL2314 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,398 | $6,825 | n/a |
UL2314 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $54,095 | $476,338 | n/a |
UL2314 # 08 Y:2023 | 08 | 2023 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $2,765 | $0 | n/a |