IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,812

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0203 # 01 Y:2023 01 2023 USE SYNTHETIC LUBRICANT $16,641 $45,000 n/a
WM0203 # 02 Y:2023 02 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $13,369 $10,160 n/a
WM0203 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,320 $13,750 n/a
WM0203 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,070 $1,900 n/a
WM0203 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,171 $17,500 n/a
WM0203 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,100 $0 n/a
MA0863 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $61,906 $581,126 n/a
MA0863 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,184 $71,775 n/a
MA0863 # 03 Y:2023 03 2023 USE HEAT PUMP FOR SPACE CONDITIONING $11,988 $30,000 n/a
MA0863 # 04 Y:2023 04 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,662 $500 n/a
MA0863 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $7,472 $38,800 n/a
MA0863 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $697 $125 n/a
MUCM17 # 01 Y:2023 01 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,804 $2,090 Not Implemented
MUCM17 # 02 Y:2023 02 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,295 $791 Not Implemented
MUCM17 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $305 $170 Implemented
MUCM17 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $117 $299 Not Implemented
MUCM17 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,951 $26,757 Implemented
MUCM17 # 06 Y:2023 06 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $5 $16 Not Implemented
NL0081 # 01 Y:2023 01 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $497,815 $199,200 Implemented
NL0081 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $15,605 $20,000 Implemented
NL0081 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $7,826 $12,000 Not Implemented
NL0081 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,819 $5,000 Implemented
NL0081 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,139 $3,320 Not Implemented
NL0081 # 06 Y:2023 06 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $937 $1,210 Not Implemented
NL0081 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $157 $225 Not Implemented