Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,256
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2508 # 03 Y:2025 | 03 | 2025 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $9,000 | $25,000 | n/a |
LS2508 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,488 | $5,190 | n/a |
LS2508 # 05 Y:2025 | 05 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $39,572 | $160,992 | n/a |
LS2508 # 06 Y:2025 | 06 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,510 | $10,600 | n/a |
LS2508 # 07 Y:2025 | 07 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,709 | $16,949 | n/a |
LS2508 # 08 Y:2025 | 08 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,663 | $48,183 | n/a |
DL0251 # 01 Y:2025 | 01 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,231 | $0 | n/a |
DL0251 # 02 Y:2025 | 02 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,414 | $0 | n/a |
DL0251 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,824 | $0 | n/a |
DL0251 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,180 | $1,075 | n/a |
DL0251 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN HIGH PRESSURE REDUCING STATIONS | $386 | $1,750 | n/a |
DL0251 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,096 | $13,500 | n/a |
DL0251 # 07 Y:2025 | 07 | 2025 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $1,561 | $16,500 | n/a |
DL0251 # 08 Y:2025 | 08 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $10,284 | $6,448 | n/a |
DL0251 # 09 Y:2025 | 09 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,031 | $7,046 | n/a |
GT0995 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,089 | $200 | n/a |
GT0995 # 02 Y:2025 | 02 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $385 | $90 | n/a |
GT0995 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,796 | $500 | n/a |
GT0995 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $432 | $200 | n/a |
GT0995 # 05 Y:2025 | 05 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $469 | $313 | n/a |
GT0995 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $746 | $567 | n/a |
GT0995 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,769 | $1,850 | n/a |
GT0995 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,545 | $269,534 | n/a |
MZ1011 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,521 | $95,000 | n/a |
MZ1011 # 02 Y:2024 | 02 | 2024 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,187 | $9,268 | n/a |