Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,875
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0235 # 07 Y:2000 | 07 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $115,354 | $4,000 | Not Implemented |
HO0235 # 08 Y:2000 | 08 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $4,200 | $375 | Implemented |
HO0235 # 09 Y:2000 | 09 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $524 | $2,500 | Implemented |
HO0233 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,704 | $12,835 | Not Implemented |
HO0233 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $822 | $800 | Not Implemented |
HO0233 # 03 Y:2000 | 03 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,080 | $0 | Implemented |
HO0233 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,361 | $400 | Implemented |
HO0233 # 05 Y:2000 | 05 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,490 | $2,000 | Implemented |
HO0233 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,314 | $90 | Not Implemented |
HO0233 # 07 Y:2000 | 07 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,000 | $8,023 | Not Implemented |
HO0233 # 08 Y:2000 | 08 | 2000 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $53,379 | $4,000 | Not Implemented |
HO0233 # 09 Y:2000 | 09 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $840 | $25 | Implemented |
HO0233 # 10 Y:2000 | 10 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,520 | $2,150 | Not Implemented |
HO0233 # 11 Y:2000 | 11 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,500 | $5,250 | Implemented |
HO0233 # 12 Y:2000 | 12 | 2000 | INSTALL SYSTEM TO COLLECT SCRAP | $4,436 | $1,000 | Implemented |
HO0233 # 13 Y:2000 | 13 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $5,400 | $750 | Implemented |
HO0233 # 14 Y:2000 | 14 | 2000 | INSTALL SYSTEM TO COLLECT SCRAP | $2,535 | $0 | Implemented |
HO0233 # 15 Y:2000 | 15 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $2,880 | $480 | Not Implemented |
HO0233 # 16 Y:2000 | 16 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $425,880 | $50,000 | Not Implemented |
HO0233 # 17 Y:2000 | 17 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $21,294 | $7,000 | Implemented |
HO0233 # 18 Y:2000 | 18 | 2000 | COVER INK CONTAINERS WHEN NOT IN USE | $12,884 | $0 | Implemented |
HO0233 # 19 Y:2000 | 19 | 2000 | IMPROVE HANDLING PRACTICES | $3,720 | $500 | Implemented |
HO0233 # 20 Y:2000 | 20 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $53,000 | $1,000 | Not Implemented |
HO0233 # 21 Y:2000 | 21 | 2000 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $22,500 | $1,000 | Implemented |
HO0233 # 22 Y:2000 | 22 | 2000 | REDUCE SCRAP PRODUCTION | $53,000 | $1,000 | Implemented |