IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0218 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,628 $1,500 Implemented
HO0218 # 03 Y:2000 03 2000 USE OPTIMUM THICKNESS INSULATION $4,499 $2,640 Implemented
HO0218 # 04 Y:2000 04 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,069 $0 Implemented
HO0218 # 05 Y:2000 05 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $3,825 $5,000 Not Implemented
HO0218 # 06 Y:2000 06 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,400 $20,000 Not Implemented
HO0218 # 07 Y:2000 07 2000 RECOVER AND REUSE WASTE MATERIAL $37,179 $0 Implemented
MA0454 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,113 $11,700 Not Implemented
MA0454 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $5,776 $16,250 Not Implemented
MA0454 # 03 Y:1999 03 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $667 $2,675 Not Implemented
MA0451 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,798 $50,000 Not Implemented
MA0451 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $3,519 $11,400 Not Implemented
MA0451 # 03 Y:1999 03 1999 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,232 $7,614 Not Implemented
MA0451 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,084 $3,400 Not Implemented
MA0451 # 05 Y:1999 05 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $680 $0 Implemented
MA0451 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $654 $985 Not Implemented
MA0451 # 07 Y:1999 07 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $500 $2,675 Not Implemented
MA0451 # 08 Y:1999 08 1999 ADJUST VENTS TO MINIMIZE ENERGY USE $228 $600 Not Implemented
HO0213 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $931 $0 Implemented
HO0213 # 02 Y:1999 02 1999 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $400 $0 Not Implemented
HO0213 # 03 Y:1999 03 1999 AIR CONDITION ONLY SPACE NECESSARY $2,807 $5,000 Not Implemented
HO0213 # 04 Y:1999 04 1999 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,786 $2,500 Not Implemented
HO0213 # 05 Y:1999 05 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $3,750 $5,000 Not Implemented
HO0213 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,813 $360 Not Implemented
HO0213 # 07 Y:1999 07 1999 CHANGE OPERATING CONDITIONS $899 $1,040 Not Implemented
HO0213 # 08 Y:1999 08 1999 MINIMIZE WATER USAGE $5,887 $4,200 Not Implemented