Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,875
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0218 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,628 | $1,500 | Implemented |
HO0218 # 03 Y:2000 | 03 | 2000 | USE OPTIMUM THICKNESS INSULATION | $4,499 | $2,640 | Implemented |
HO0218 # 04 Y:2000 | 04 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,069 | $0 | Implemented |
HO0218 # 05 Y:2000 | 05 | 2000 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $3,825 | $5,000 | Not Implemented |
HO0218 # 06 Y:2000 | 06 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $5,400 | $20,000 | Not Implemented |
HO0218 # 07 Y:2000 | 07 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $37,179 | $0 | Implemented |
MA0454 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,113 | $11,700 | Not Implemented |
MA0454 # 02 Y:1999 | 02 | 1999 | OPTIMIZE PLANT POWER FACTOR | $5,776 | $16,250 | Not Implemented |
MA0454 # 03 Y:1999 | 03 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $667 | $2,675 | Not Implemented |
MA0451 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $30,798 | $50,000 | Not Implemented |
MA0451 # 02 Y:1999 | 02 | 1999 | OPTIMIZE PLANT POWER FACTOR | $3,519 | $11,400 | Not Implemented |
MA0451 # 03 Y:1999 | 03 | 1999 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $2,232 | $7,614 | Not Implemented |
MA0451 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,084 | $3,400 | Not Implemented |
MA0451 # 05 Y:1999 | 05 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $680 | $0 | Implemented |
MA0451 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $654 | $985 | Not Implemented |
MA0451 # 07 Y:1999 | 07 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $500 | $2,675 | Not Implemented |
MA0451 # 08 Y:1999 | 08 | 1999 | ADJUST VENTS TO MINIMIZE ENERGY USE | $228 | $600 | Not Implemented |
HO0213 # 01 Y:1999 | 01 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $931 | $0 | Implemented |
HO0213 # 02 Y:1999 | 02 | 1999 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $400 | $0 | Not Implemented |
HO0213 # 03 Y:1999 | 03 | 1999 | AIR CONDITION ONLY SPACE NECESSARY | $2,807 | $5,000 | Not Implemented |
HO0213 # 04 Y:1999 | 04 | 1999 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,786 | $2,500 | Not Implemented |
HO0213 # 05 Y:1999 | 05 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $3,750 | $5,000 | Not Implemented |
HO0213 # 06 Y:1999 | 06 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,813 | $360 | Not Implemented |
HO0213 # 07 Y:1999 | 07 | 1999 | CHANGE OPERATING CONDITIONS | $899 | $1,040 | Not Implemented |
HO0213 # 08 Y:1999 | 08 | 1999 | MINIMIZE WATER USAGE | $5,887 | $4,200 | Not Implemented |