IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0317 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,481 $4,500 Not Implemented
SD0317 # 06 Y:2003 06 2003 INSTALL SKYLIGHTS $1,552 $600 Not Implemented
SD0317 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,800 $10,000 Not Implemented
SF0256 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,773 $636 Not Implemented
SF0256 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $593 $433 Not Implemented
SF0256 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,197 $8,880 Not Implemented
SF0256 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $2,150 $5,160 Not Implemented
SF0256 # 05 Y:2003 05 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $11,466 $7,440 Not Implemented
SF0256 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $382 $1,618 Not Implemented
SF0256 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $801 $5,231 Not Implemented
SF0256 # 08 Y:2003 08 2003 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $975 $1,800 Not Implemented
UM0229 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,914 $100,000 Not Implemented
UM0229 # 02 Y:2003 02 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,030 $5,280 Not Implemented
UM0229 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,440 $6,423 Not Implemented
UM0229 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,970 $300 Not Implemented
IA0314 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,950 $267 Implemented
IA0314 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $872 $30 Implemented
IA0314 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $766 $130 Not Implemented
IA0314 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $443 $238 Implemented
IA0314 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,483 $26,776 Not Implemented
IA0314 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,549 $7,100 Not Implemented
IA0314 # 07 Y:2003 07 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $491 $520 Implemented
AS0347 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,462 $0 Implemented
AS0347 # 02 Y:2003 02 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,330 $8,920 Implemented
AS0347 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,837 $60 Implemented