IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,443

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0018 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $440 $210 Implemented
NL0015 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,693 $189,100 Implemented
NL0015 # 02 Y:2017 02 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,416 $0 Implemented
NL0015 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $5,079 $12,500 Not Implemented
NL0015 # 04 Y:2017 04 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,800 $0 Implemented
NL0015 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,190 $4,500 Implemented
NL0014 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $9,200 $1,630 Implemented
NL0014 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,430 $12,500 Implemented
NL0014 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,100 $0 Implemented
NL0014 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,804 $2,500 Implemented
NL0014 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $260 $225 Not Implemented
NL0013 # 01 Y:2017 01 2017 RECOVER AND REUSE WASTE MATERIAL $6,493 $7,000 Not Implemented
NL0013 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $6,000 $16,000 Implemented
NL0013 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,676 $452 Implemented
NL0013 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $668 $0 Not Implemented
NL0013 # 05 Y:2017 05 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $485 $273 Not Implemented
NL0013 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $309 $111 Not Implemented
NL0013 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $133 $110 Not Implemented
NL0010 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,500 $106,600 Implemented
NL0010 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $3,700 $2,470 Not Implemented
NL0010 # 03 Y:2017 03 2017 MAINTAIN MACHINES TO REDUCE LEAKS $700 $520 Implemented
NL0012 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,477 $136 Implemented
NL0012 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,200 $0 Not Implemented
NL0012 # 03 Y:2017 03 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,183 $250 Implemented
NL0012 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,638 $9,825 Implemented