IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,734

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0603 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,450 $120 Not Implemented
SF0603 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,983 $141 Implemented
SF0603 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,760 $1,440 Implemented
SF0603 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,008 $7,651 Implemented
SF0603 # 05 Y:2023 05 2023 USE PHOTOCELL CONTROLS $3,805 $9,018 Implemented
SF0603 # 06 Y:2023 06 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,772 $124,644 Implemented
SF0603 # 07 Y:2023 07 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $608 $2,572 Implemented
SF0603 # 08 Y:2023 08 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $568,246 $3,565,479 Not Implemented
SJ0005 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,218 $962 Implemented
SJ0005 # 02 Y:2023 02 2023 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $23,445 $5,613 Not Implemented
SJ0005 # 03 Y:2023 03 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $270 $0 Not Implemented
SJ0005 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,251 $4,556 Not Implemented
SJ0005 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $854 $658 Not Implemented
SJ0005 # 06 Y:2023 06 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $5,992 $2,536 Implemented
UD1059 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $43,663 $1,000 Implemented
UD1059 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,386 $1,200 Implemented
UD1059 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,947 $14,000 Implemented
UD1059 # 04 Y:2023 04 2023 DISCONNECT BALLASTS $776 $3,500 Not Implemented
UD1059 # 05 Y:2023 05 2023 UPGRADE CONVEYORS $150,522 $270,472 Not Implemented
UD1059 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,047 $800 Implemented
UD1059 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $403 $0 Not Implemented
AM0885 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,122 $2,000 n/a
AM0885 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $36,090 $840,312 n/a
AM0885 # 03 Y:2023 03 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,486 $2,000 n/a
KS2319 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,385 $5,960 n/a