IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,585

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1058 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,307 $29,827 Implemented
UD1058 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $949 $290 Not Implemented
TT0295 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,897 $44,225 Not Implemented
TT0295 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,115 $20,000 Not Implemented
TT0295 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,010 $1,360 Not Implemented
TT0295 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,448 $2,000 Not Implemented
TT0295 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $646 $2,610 Not Implemented
TT0295 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $377 $150 Not Implemented
SF0602 # 01 Y:2023 01 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $632 $0 n/a
SF0602 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,182 $1,800 n/a
SF0602 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,138 $2,126 n/a
SF0602 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,571 $47,276 n/a
SF0602 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $31,205 $105,364 n/a
SF0602 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,247 $30,019 n/a
IC0281 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $109,160 $660,787 Not Implemented
IC0281 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,262 $5,407 Not Implemented
IC0281 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,197 $3,250 Implemented
IC0281 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,536 $7,857 Implemented
IC0281 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $1,249 $804 Implemented
IC0281 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,327 $2,879 Not Implemented
MZ0348 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $13,016 $3,000 n/a
MZ0348 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,209 $3,330 n/a
MZ0348 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,900 $2,660 n/a
MZ0348 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,917 $1,548 n/a
MZ0348 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $3,429 $830 n/a