Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0707 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $103 $72 Implemented
GT0707 # 06 Y:2001 06 2001 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $7,808 $0 Implemented
GT0707 # 07 Y:2001 07 2001 $45,820 $0 Implemented
GT0707 # 08 Y:2001 08 2001 INSTALL OCCUPANCY SENSORS $179 $250 Not Implemented
AS0295 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,104 $5,107 Not Implemented
AS0295 # 02 Y:2001 02 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,459 $10,800 Not Implemented
AS0295 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $433 $450 Not Implemented
AS0295 # 04 Y:2001 04 2001 USE SYNTHETIC LUBRICANT $826 $694 Not Implemented
AS0295 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $152 $60 Not Implemented
AS0295 # 06 Y:2001 06 2001 $234,131 $140,869 Implemented
SU0101 # 01 Y:2001 01 2001 RECYCLE CASTING SAND $35,529 $45,000 Implemented
SU0101 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $370 $0 Implemented
SU0101 # 03 Y:2001 03 2001 AIR CONDITION ONLY SPACE NECESSARY $176 $253 Not Implemented
SU0101 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $2,500 $8,350 Not Implemented
MS0179 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,073 $3,000 Implemented
MS0179 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,805 $3,789 Not Implemented
MS0179 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,391 $136 Implemented
MS0179 # 04 Y:2001 04 2001 INSTALL TIMERS AND/OR THERMOSTATS $454 $236 Not Implemented
MS0179 # 05 Y:2001 05 2001 SHUT OFF PILOTS IN STANDBY EQUIPMENT $229 $88 Implemented
MS0179 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $177 $195 Not Implemented
MS0179 # 07 Y:2001 07 2001 BURN WASTE OIL FOR HEAT $1,676 $2,374 Not Implemented
MS0179 # 08 Y:2001 08 2001 USE RE-USABLE FILTERS $91 $133 Not Implemented
MS0179 # 09 Y:2001 09 2001 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,578 $869 Not Implemented
LL0101 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $646 $854 Not Implemented
LL0101 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $478 $1,200 Not Implemented