IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,184

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0022 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,304 $17,920 Implemented
ND0022 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,245 $5,000 Implemented
ND0022 # 03 Y:1992 03 1992 DIRECT WARMEST AIR TO COMBUSTION INTAKE $645 $500 Implemented
ND0022 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,741 $749 Implemented
ND0022 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $404 $400 Implemented
ND0022 # 06 Y:1992 06 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $565 $1,800 Not Implemented
ND0025 # 01 Y:1992 01 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,354 $1,000 Implemented
ND0025 # 02 Y:1992 02 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,815 $8,000 Implemented
ND0025 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,424 $1,584 Not Implemented
ND0025 # 04 Y:1992 04 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,571 $0 Not Implemented
ND0025 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $409 $300 Implemented
ND0025 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $140 $250 Implemented
TS0033 # 01 Y:1986 01 1986 INSULATE BARE EQUIPMENT $13,881 $2,730 Not Implemented
TS0033 # 02 Y:1986 02 1986 USE OPTIMUM THICKNESS INSULATION $1,345 $2,730 Not Implemented
TS0033 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,996 $178 Not Implemented
TS0033 # 04 Y:1986 04 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,601 $0 Not Implemented
TS0033 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,451 $1,000 Not Implemented
TS0033 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $922 $1,300 Not Implemented
TS0026 # 01 Y:1985 01 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,637 $3,240 Not Implemented
TS0026 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $325 $460 Not Implemented
TS0026 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,640 $503 Not Implemented
TS0026 # 04 Y:1985 04 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,372 $400 Not Implemented
TS0023 # 01 Y:1985 01 1985 OPTIMIZE PLANT POWER FACTOR $1,342 $4,400 Not Implemented
TS0023 # 02 Y:1985 02 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,162 $0 Not Implemented
TS0023 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $928 $0 Not Implemented