Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0683 # 02 Y:2017 | 02 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $16,054 | $2,000 | Not Implemented |
OR0683 # 03 Y:2017 | 03 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $4,107 | $670 | Implemented |
OR0683 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,828 | $17,274 | Not Implemented |
OR0683 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,688 | $32,940 | Not Implemented |
OR0683 # 06 Y:2017 | 06 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,456 | $10,125 | Not Implemented |
OR0675 # 01 Y:2016 | 01 | 2016 | INSTALL EQUIPMENT TO MOVE PRODUCT | $79,123 | $89,654 | Implemented |
OR0675 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,062 | $1,969 | Implemented |
OR0675 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,809 | $23,810 | Implemented |
OR0675 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,199 | $7,215 | Not Implemented |
BS0084 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,444 | $31,350 | Not Implemented |
BS0084 # 02 Y:2016 | 02 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,854 | $15 | Not Implemented |
BS0084 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,738 | $825 | Not Implemented |
BS0084 # 04 Y:2016 | 04 | 2016 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $751 | $243 | Not Implemented |
BS0084 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $118 | $264 | Not Implemented |
OR0674 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,868 | $0 | Not Implemented |
OR0674 # 02 Y:2016 | 02 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,376 | $4,258 | Implemented |
OR0674 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,953 | $0 | Implemented |
OR0673 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $157,793 | $301,613 | Not Implemented |
OR0673 # 02 Y:2016 | 02 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $102,571 | $10,390 | Not Implemented |
OR0673 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $4,333 | $229 | Not Implemented |
OR0673 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,117 | $5,344 | Implemented |
OR0673 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,464 | $0 | Implemented |
BS0079 # 01 Y:2016 | 01 | 2016 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,545 | $6,216 | Not Implemented |
BS0079 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $154 | $148 | Implemented |
BS0079 # 03 Y:2016 | 03 | 2016 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $232 | $850 | Not Implemented |