Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0230 # 09 Y:2002 | 09 | 2002 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $3,872 | $300 | Implemented |
WV0230 # 10 Y:2002 | 10 | 2002 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $18,994 | $0 | Implemented |
UD0635 # 01 Y:2002 | 01 | 2002 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $73,991 | $0 | Not Implemented |
UD0635 # 02 Y:2002 | 02 | 2002 | INSULATE BARE EQUIPMENT | $12,374 | $2,380 | Not Implemented |
UD0635 # 03 Y:2002 | 03 | 2002 | FILTER AND REUSE HYDRAULIC OIL | $5,357 | $3,323 | Not Implemented |
UD0635 # 04 Y:2002 | 04 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,701 | $0 | Not Implemented |
UD0635 # 05 Y:2002 | 05 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,985 | $2,775 | Not Implemented |
UD0635 # 06 Y:2002 | 06 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,588 | $2,775 | Not Implemented |
UD0635 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,549 | $3,104 | Not Implemented |
UD0635 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $993 | $1,725 | Not Implemented |
UD0635 # 09 Y:2002 | 09 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $500 | $1,800 | Implemented |
UD0635 # 10 Y:2002 | 10 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $446 | $0 | Not Implemented |
UD0635 # 11 Y:2002 | 11 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $232 | $361 | Not Implemented |
IC0026 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $945 | $8,326 | Implemented |
IC0026 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,379 | $25,075 | Not Implemented |
IC0026 # 03 Y:2002 | 03 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $102 | $150 | Implemented |
IC0026 # 04 Y:2002 | 04 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $205,600 | $100,000 | Not Implemented |
IC0026 # 05 Y:2002 | 05 | 2002 | MODIFY WORKLOAD | $77,900 | $23,900 | Implemented |
UM0205 # 01 Y:2002 | 01 | 2002 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $18,000 | $5,940 | Implemented |
UM0205 # 02 Y:2002 | 02 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,300 | $15,000 | Implemented |
UM0205 # 03 Y:2002 | 03 | 2002 | REDUCE FLUID FLOW RATES | $4,604 | $1,600 | Not Implemented |
UM0205 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,937 | $11,015 | Not Implemented |
UM0205 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,362 | $300 | Implemented |
UM0205 # 06 Y:2002 | 06 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $932 | $1,000 | Implemented |
UM0204 # 01 Y:2002 | 01 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $22,500 | $27,500 | Not Implemented |