IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0077 # 09 Y:1997 09 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $35,000 $28,000 Implemented
OD0081 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,491 $5,176 n/a
OD0081 # 02 Y:1997 02 1997 SHUT OFF PILOTS IN STANDBY EQUIPMENT $222 $0 n/a
OD0081 # 03 Y:1997 03 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $485 $0 n/a
OD0081 # 04 Y:1997 04 1997 ELIMINATE A BY-PRODUCT $204,312 $6,350 n/a
OD0081 # 05 Y:1997 05 1997 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $551,875 $51,389 n/a
NC0109 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,734 $630 Implemented
NC0109 # 02 Y:1997 02 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,491 $650 Not Implemented
NC0109 # 03 Y:1997 03 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,246 $0 Not Implemented
NC0109 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $210 $402 Implemented
NC0109 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,281 $1,200 Implemented
NC0109 # 06 Y:1997 06 1997 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $9,315 $30,000 Not Implemented
NC0109 # 07 Y:1997 07 1997 EXPAND OPERATIONS INTO UNUSED SPACE $3,436,000 $2,250,000 Not Implemented
OR0292 # 01 Y:1997 01 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $116,300 $0 Implemented
OR0292 # 02 Y:1997 02 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $17,850 $0 Implemented
OR0292 # 03 Y:1997 03 1997 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $11,080 $2,000 Implemented
OR0292 # 04 Y:1997 04 1997 USE OTHER WASTE CONCENTRATION METHODS $6,602 $10,000 Not Implemented
OR0292 # 05 Y:1997 05 1997 KEEP BOILER TUBES CLEAN $7,179 $500 Implemented
OR0292 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,202 $1,144 Implemented
OR0292 # 07 Y:1997 07 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $12,370 $23,720 Not Implemented
OR0292 # 08 Y:1997 08 1997 OPTIMIZE PLANT POWER FACTOR $8,246 $28,000 Not Implemented
OR0292 # 09 Y:1997 09 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,215 $23,353 Implemented
OR0292 # 10 Y:1997 10 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $250,000 $0 Implemented
OR0292 # 11 Y:1997 11 1997 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $375,000 $0 Implemented
UL0176 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $802 $1,661 Implemented