IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,803

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0177 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,187 $0 Not Implemented
IP0177 # 06 Y:2023 06 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $91,806 $8,000 Not Implemented
IP0177 # 07 Y:2023 07 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,815 $653 Not Implemented
IP0177 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $1,228 $764 Not Implemented
IP0177 # 09 Y:2023 09 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,101 $1,200 Not Implemented
IP0177 # 10 Y:2023 10 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,349 $3,260 Not Implemented
IP0177 # 11 Y:2023 11 2023 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $409,614 $304,570 Not Implemented
IP0177 # 12 Y:2023 12 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,714 $17,391 Not Implemented
UW2311 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,427 $15,722 Implemented
UW2311 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,668 $83,148 Implemented
UW2311 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $2,080 Implemented
UW2311 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $112,574 $693,588 Implemented
UW2311 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $11,250 $49,905 Implemented
UU0234 # 01 Y:2023 01 2023 ISOLATE HOT OR COLD EQUIPMENT $6,940 $1,552 Implemented
UU0234 # 02 Y:2023 02 2023 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,263 $1,210 Implemented
UU0234 # 03 Y:2023 03 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $90 $400 Implemented
UU0234 # 04 Y:2023 04 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $63 $305 Not Implemented
UL2309 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,305 $2,688 Implemented
UL2309 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $957 $1,596 Implemented
UL2309 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,637 $0 Implemented
UL2309 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,370 $18,360 Implemented
UL2309 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $194,066 $1,198,885 Not Implemented
UL2309 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,607 $1,000 Not Implemented
UL2309 # 07 Y:2023 07 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,813 $15,000 Not Implemented
OR0776 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $1,131 $6,802 Implemented