IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,615

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0836 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,781 $625 Implemented
MA0836 # 03 Y:2022 03 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,895 $23,950 Implemented
MA0836 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,264 $875 Not Implemented
MA0739 # 07 Y:2015 07 2015 PAY UTILITY BILLS ON TIME $426 $500 Implemented
MA0739 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,369 $11,834 Not Implemented
MA0739 # 06 Y:2015 06 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $475 $915 Not Implemented
MA0739 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,543 $500 Implemented
MA0739 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $927 $1,570 Implemented
MA0739 # 04 Y:2015 04 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $880 $1,285 Implemented
MA0739 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $864 $2,635 Not Implemented
MA0723 # 01 Y:2014 01 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,304 $90,000 Implemented
MA0723 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,158 $1,250 Implemented
MA0723 # 04 Y:2014 04 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $11,047 $32,000 Not Implemented
MA0723 # 03 Y:2014 03 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,628 $5,000 Implemented
MA0723 # 02 Y:2014 02 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $20,745 $110,500 Implemented
MA0607 # 05 Y:2006 05 2006 USE UTILITY CONTROLLED POWER MANAGEMENT $12,223 $14,000 Not Implemented
MA0607 # 04 Y:2006 04 2006 REDUCE VENTILATION AIR $12,889 $1,700 Not Implemented
MA0607 # 03 Y:2006 03 2006 BURN A LESS EXPENSIVE GRADE OF FUEL $14,261 $5,500 Not Implemented
MA0607 # 02 Y:2006 02 2006 REDUCE VENTILATION AIR $45,943 $10,400 Not Implemented
MA0607 # 01 Y:2006 01 2006 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $46,963 $0 Not Implemented
MA0607 # 07 Y:2006 07 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,860 $3,500 Not Implemented
MA0607 # 06 Y:2006 06 2006 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,577 $1,870 Not Implemented
MA0565 # 06 Y:2004 06 2004 INSULATE FEEDWATER TANK $873 $300 Implemented
MA0565 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $2,705 $754 Implemented
MA0565 # 04 Y:2004 04 2004 REPLACE BOILER $2,760 $750 Implemented