IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,150

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0111 # 03 Y:1983 03 1983 INSTALL AUTOMATIC STACK DAMPER $246 $400 Not Implemented
GT0202 # 09 Y:1983 09 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $18,169 $40,000 Not Implemented
GT0201 # 10 Y:1983 10 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $27,900 $50,000 Implemented
GT0200 # 01 Y:1983 01 1983 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $373,500 $220,000 Not Implemented
GT0201 # 09 Y:1983 09 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,028 $4,000 Implemented
GT0204 # 03 Y:1983 03 1983 REPAIR AND ELIMINATE STEAM LEAKS $8,427 $700 Not Implemented
GT0202 # 04 Y:1983 04 1983 MODIFY DYE BECK $30,019 $100,000 Not Implemented
GT0204 # 04 Y:1983 04 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,370 $5,000 Not Implemented
KU0111 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $214 $200 Implemented
GT0202 # 10 Y:1983 10 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,165 $1,800 Not Implemented
GT0201 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,132 $500 Implemented
KU0111 # 06 Y:1983 06 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $214 $0 Not Implemented
KU0110 # 06 Y:1983 06 1983 INSTALL TIMERS AND/OR THERMOSTATS $445 $200 Not Implemented
GT0202 # 08 Y:1983 08 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,082 $9,115 Not Implemented
GT0204 # 02 Y:1983 02 1983 MODIFY TEXTILE DRYERS $67,354 $50,000 Not Implemented
GT0202 # 05 Y:1983 05 1983 MODIFY DYE BECK $14,050 $31,000 Not Implemented
GT0200 # 05 Y:1983 05 1983 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $9,885 $15,000 Not Implemented
GT0201 # 04 Y:1983 04 1983 MODIFY DYE BECK $58,597 $101,000 Implemented
UD0111 # 06 Y:1983 06 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,626 $1,590 Not Implemented
KU0111 # 02 Y:1983 02 1983 INSULATE BARE EQUIPMENT $272 $391 Not Implemented
GT0201 # 06 Y:1983 06 1983 MODIFY TEXTILE DRYERS $33,809 $35,000 Implemented
KU0110 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,125 $300 Not Implemented
GT0200 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $33,660 $30,000 Not Implemented
GT0202 # 06 Y:1983 06 1983 MODIFY TEXTILE DRYERS $28,233 $27,000 Not Implemented
KU0111 # 05 Y:1983 05 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $564 $438 Not Implemented