IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0225 # 12 Y:1998 12 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,085 $0 Implemented
MO0225 # 13 Y:1998 13 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $48,948 $50,000 Not Implemented
MO0225 # 14 Y:1998 14 1998 USE RE-USABLE FILTERS $774 $799 Not Implemented
UD0538 # 01 Y:1998 01 1998 IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION $211,528 $50,000 Implemented
UD0538 # 02 Y:1998 02 1998 MOVE PRODUCT USING MECHANICAL MEANS $44,426 $3,000 Not Implemented
UD0538 # 03 Y:1998 03 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,377 $-10,000 Not Implemented
UD0538 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,771 $5,737 Implemented
UM0114 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,627 $3,217 Implemented
UM0114 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,918 $17,712 Implemented
UM0114 # 03 Y:1998 03 1998 USE RADIANT HEATER FOR SPOT HEATING $1,806 $192 Not Implemented
UM0114 # 04 Y:1998 04 1998 $22,312 $2,560 Not Implemented
UM0114 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $22,600 $2,400 Implemented
UM0114 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $16,900 $33,000 Not Implemented
AM0317 # 01 Y:1998 01 1998 RECOVER AND REUSE WASTE MATERIAL $35,800 $137,500 Not Implemented
AM0317 # 02 Y:1998 02 1998 OPTIMIZE PLANT POWER FACTOR $23,300 $25,000 Not Implemented
AM0317 # 03 Y:1998 03 1998 RECOVER AND REUSE WASTE MATERIAL $12,000 $410 Implemented
AM0317 # 04 Y:1998 04 1998 RECOVER AND REUSE WASTE MATERIAL $10,900 $9,000 Not Implemented
AM0317 # 05 Y:1998 05 1998 PAY UTILITY BILLS ON TIME $2,662 $0 Implemented
AM0317 # 06 Y:1998 06 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,540 $0 Implemented
AM0317 # 07 Y:1998 07 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $555 $320 Implemented
AM0317 # 08 Y:1998 08 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $540 $0 Not Implemented
AM0317 # 09 Y:1998 09 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $130 $24 Not Implemented
KU0489 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,370 $15,320 Implemented
KU0489 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,520 $4,600 Implemented
KU0489 # 03 Y:1998 03 1998 INSULATE BARE EQUIPMENT $1,510 $2,370 Not Implemented