IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0246 # 20 Y:2003 20 2003 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING $11,550 $1,000 Not Implemented
WI0455 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,710 $2,500 Implemented
WI0455 # 02 Y:2003 02 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $12,503 $2,000 Not Implemented
WI0455 # 03 Y:2003 03 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,687 $1,000 Not Implemented
WI0455 # 04 Y:2003 04 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,787 $0 Not Implemented
WI0455 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,232 $1,240 Not Implemented
WI0455 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $716 $0 Not Implemented
SU0170 # 01 Y:2003 01 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,400 $0 Not Implemented
SU0170 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,210 $0 Not Implemented
SU0170 # 03 Y:2003 03 2003 ADVERTISE PRODUCT OR SERVICE $31,250 $1,000 Implemented
SU0170 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,181 $47 Implemented
SU0170 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $466 $57 Implemented
SU0170 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,229 $185 Implemented
SU0170 # 07 Y:2003 07 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,666 $16,761 Not Implemented
SU0170 # 08 Y:2003 08 2003 REPLACE BOILER $10,809 $33,514 Not Implemented
SF0272 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,205 $0 Implemented
SF0272 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $542 $0 Implemented
SF0272 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,425 $190 Not Implemented
SF0272 # 04 Y:2003 04 2003 USE PHOTOCELL CONTROLS $4,362 $2,280 Not Implemented
SF0272 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $20,993 $20,000 Not Implemented
SF0272 # 06 Y:2003 06 2003 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,079 $812 Not Implemented
SF0272 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $521 $1,231 Not Implemented
NC0270 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $149,890 $50,000 Implemented
NC0270 # 02 Y:2003 02 2003 TREAT AND REUSE RINSE WATERS $71,629 $300,000 Not Implemented
NC0270 # 03 Y:2003 03 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $15,758 $45,000 Not Implemented