IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0208 # 08 Y:1997 08 1997 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $354 $0 Not Implemented
ME0208 # 09 Y:1997 09 1997 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $24,276 $6,900 Implemented
ME0208 # 10 Y:1997 10 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $143 $400 Implemented
GT0607 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,960 $62,150 Implemented
GT0607 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,502 $5,320 Not Implemented
GT0607 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,568 $29,830 Implemented
GT0607 # 04 Y:1997 04 1997 METER WASTE WATER $580 $0 Not Implemented
GT0607 # 05 Y:1997 05 1997 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $90,000 $21,000 Implemented
GT0607 # 06 Y:1997 06 1997 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,086 $15,000 Implemented
GT0607 # 07 Y:1997 07 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,924 $13,000 Implemented
GT0607 # 08 Y:1997 08 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $30,229 $18,000 Implemented
KG0084 # 01 Y:1997 01 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,940 $0 n/a
KG0084 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,366 $1,022 n/a
KG0084 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,635 $6,140 n/a
KG0084 # 04 Y:1997 04 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $33,600 $12,995 n/a
KG0084 # 05 Y:1997 05 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $22,469 $7,757 n/a
KG0084 # 06 Y:1997 06 1997 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $800,000 $0 n/a
CO0381 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $689 $1,914 Implemented
CO0381 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $179 $602 Implemented
CO0381 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,020 $190 Implemented
CO0381 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $770 $510 Not Implemented
CO0381 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,550 $12,500 Implemented
CO0381 # 06 Y:1997 06 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $75,250 $320,000 Implemented
TN0601 # 01 Y:1997 01 1997 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $13,200 $0 Not Implemented
TN0601 # 02 Y:1997 02 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,865 $8,000 Not Implemented