IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0560 # 10 Y:1999 10 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $563 $380 Implemented
UD0560 # 11 Y:1999 11 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $494 $0 Implemented
MO0246 # 01 Y:1999 01 1999 INCREASE USE OF AUTOMATION $31,680 $7,000 Implemented
MO0246 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,027 $8,072 Implemented
MO0246 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,419 $277 Implemented
MO0246 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,019 $40 Implemented
MO0246 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,732 $4,699 Implemented
MO0246 # 06 Y:1999 06 1999 MINIMIZE WATER USAGE $3,728 $11,000 Not Implemented
MO0246 # 07 Y:1999 07 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,320 $0 Implemented
NC0156 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,453 $15,000 Not Implemented
NC0156 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $27,013 $1,295 Not Implemented
NC0156 # 03 Y:1999 03 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $461,046 $1,000,000 Implemented
NC0156 # 04 Y:1999 04 1999 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $65,000 $80,000 Implemented
NC0156 # 05 Y:1999 05 1999 USE REACTIVE RINSING $2,015 $325 Not Implemented
AS0241 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,409 $5,640 Not Implemented
AS0241 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,122 $1,420 Implemented
AS0241 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $571 $700 Implemented
AS0241 # 04 Y:1999 04 1999 INSTALL TIMERS AND/OR THERMOSTATS $132 $225 Implemented
AS0241 # 05 Y:1999 05 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $16,449 $7,556 Not Implemented
AS0241 # 06 Y:1999 06 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,241 $120 Implemented
AS0241 # 07 Y:1999 07 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $81,150 $9,280 Not Implemented
HO0190 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,715 $15,311 Not Implemented
HO0190 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,478 $39,600 Not Implemented
HO0190 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $39,503 $85,000 Not Implemented
HO0190 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,524 $2,500 Implemented