IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,734

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0527 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $484 $224 Not Implemented
SU0527 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,990 $1,787 Not Implemented
SU0527 # 08 Y:2022 08 2022 INSULATE BARE EQUIPMENT $18,264 $9,030 Not Implemented
SU0527 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,474 $24,111 Not Implemented
SU0527 # 10 Y:2022 10 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $40,423 $248,940 Not Implemented
UU0212 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,149 $8,500 Not Implemented
UU0212 # 02 Y:2023 02 2023 REPLACE BOILER $11,580 $80,000 Not Implemented
UU0212 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,326 $21,555 Not Implemented
UU0212 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $4,400 $9,000 Not Implemented
UU0212 # 05 Y:2023 05 2023 USE OPTIMUM THICKNESS INSULATION $4,220 $4,402 Not Implemented
UU0212 # 06 Y:2023 06 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $425 $850 Not Implemented
UU0212 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $382 $1,370 Not Implemented
UU0213 # 01 Y:2023 01 2023 USE POWER DURING OFF-PEAK PERIODS $7,487 $8,000 Not Implemented
UU0213 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $5,181 $18,250 Not Implemented
UU0213 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,602 $1,773 Not Implemented
UU0213 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $1,190 $3,000 Not Implemented
UU0213 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $639 $1,950 Not Implemented
AM0867 # 01 Y:2023 01 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $259,000 $25,200 Not Implemented
AM0867 # 02 Y:2023 02 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $263,000 $452,400 Implemented
AM0867 # 03 Y:2023 03 2023 REPAIR OR REPLACE STEAM TRAPS $109,400 $10,100 Not Implemented
AM0867 # 04 Y:2023 04 2023 REDUCE EXCESSIVE BOILER BLOWDOWN $67,910 $12,000 Not Implemented
AM0867 # 05 Y:2023 05 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $34,000 $10,000 Not Implemented
AM0867 # 06 Y:2023 06 2023 OPTIMIZE PLANT POWER FACTOR $23,500 $87,830 Not Implemented
UC2205 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,071 $2,641 Not Implemented
UC2205 # 02 Y:2022 02 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $19,018 $0 Not Implemented