IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,855

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0882 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $23,699 $5,000 Implemented
AM0882 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,185 $690 Implemented
AM0882 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $635 $0 Implemented
AM0882 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $900 $0 Implemented
AM0882 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $360 $290 Implemented
AM0882 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $435 $1,900 Implemented
AM0882 # 07 Y:2023 07 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $310 $90 Implemented
UD1057 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $9,795 $480 Implemented
UD1057 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $332 $1,200 Implemented
UD1057 # 03 Y:2023 03 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,326 $2,880 Not Implemented
UD1057 # 04 Y:2023 04 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $133 $413 Not Implemented
UD1057 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,173 $0 Implemented
UD1057 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,974 $952 Implemented
UD1057 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $767 $3,117 Not Implemented
UD1057 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,676 $13,290 Implemented
UD1057 # 09 Y:2023 09 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,273 $24,175 Not Implemented
UD1057 # 10 Y:2023 10 2023 OPTIMIZE PLANT POWER FACTOR $7,417 $31,038 Not Implemented
UF0596 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,546,439 $3,990,000 Not Implemented
UF0596 # 02 Y:2023 02 2023 INSTALL SUB-METERING EQUIPMENT $266,539 $15,232 Implemented
UF0596 # 03 Y:2023 03 2023 DIRECT WARMEST AIR TO COMBUSTION INTAKE $232,670 $300,000 Implemented
UF0596 # 04 Y:2023 04 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $213,087 $0 Implemented
UF0596 # 05 Y:2023 05 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $145,162 $141,225 Implemented
UF0596 # 06 Y:2023 06 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $50,904 $49,563 Implemented
UF0596 # 07 Y:2023 07 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $47,000 $171,903 Implemented
UF0596 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,499 $1,399 Implemented