IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,224

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0282 # 04 Y:2004 04 2004 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,574 $1,000 n/a
NC0282 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,233 $240 n/a
NC0282 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,215 $936 n/a
NC0278 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,343 $18,000 n/a
NC0278 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $458 $1,750 Not Implemented
NC0278 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $47 $25 Implemented
NC0278 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,132 $630 Not Implemented
NC0278 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $574 $25 Implemented
NC0278 # 06 Y:2004 06 2004 USE PHOTOCELL CONTROLS $72 $130 Implemented
NC0277 # 01 Y:2004 01 2004 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $40,000 $1,000 Not Implemented
NC0277 # 02 Y:2004 02 2004 DEVELOP A REPAIR/REPLACE POLICY $2,250 $710 Implemented
NC0277 # 03 Y:2004 03 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,330 $6,680 Implemented
NC0277 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $750 $782 Implemented
NC0277 # 05 Y:2004 05 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,387 $1,900 Not Implemented
NC0277 # 06 Y:2004 06 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $1,049 $1,000 Implemented
NC0274 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,125 $77,500 Not Implemented
NC0274 # 02 Y:2003 02 2003 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $36,152 $81,000 Not Implemented
NC0274 # 03 Y:2003 03 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,209 $200 Implemented
NC0274 # 04 Y:2003 04 2003 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $9,743 $36,000 Not Implemented
NC0274 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,021 $1,000 Implemented
NC0274 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,705 $2,885 Not Implemented
GT0768 # 01 Y:2003 01 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,075 $15,000 n/a
GT0768 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,376 $0 n/a
GT0768 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $42,648 $0 n/a
GT0768 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $13,900 $2,400 n/a