Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0640 # 01 Y:2014 | 01 | 2014 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $131,605 | $242,261 | Implemented |
OR0640 # 02 Y:2014 | 02 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,455 | $0 | Not Implemented |
OR0640 # 03 Y:2014 | 03 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,298 | $1,020 | Not Implemented |
OR0640 # 04 Y:2014 | 04 | 2014 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $20,241 | $67,550 | Not Implemented |
OR0640 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,092 | $12,092 | Implemented |
OR0639 # 01 Y:2014 | 01 | 2014 | IMPROVE COMBUSTION CONTROL CAPABILITY | $14,677 | $12,315 | Implemented |
OR0639 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,461 | $360 | Implemented |
OR0639 # 03 Y:2014 | 03 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,572 | $7,500 | Not Implemented |
OR0639 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $7,377 | $7,643 | Implemented |
OR0639 # 05 Y:2014 | 05 | 2014 | OPTIMIZE PLANT POWER FACTOR | $3,528 | $15,201 | Not Implemented |
OR0638 # 01 Y:2014 | 01 | 2014 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $237,276 | $62,840 | Not Implemented |
OR0638 # 02 Y:2014 | 02 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $28,255 | $27,375 | Not Implemented |
OR0638 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,466 | $8,550 | Not Implemented |
OR0638 # 04 Y:2014 | 04 | 2014 | MINIMIZE WATER USAGE | $1,003 | $0 | Implemented |
OR0638 # 05 Y:2014 | 05 | 2014 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,008 | $9,020 | Not Implemented |
OR0638 # 06 Y:2014 | 06 | 2014 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $40,207 | $13,800 | Not Implemented |
OR0638 # 07 Y:2014 | 07 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $21,180 | $10,000 | Implemented |
OR0637 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,883 | $750 | Not Implemented |
OR0637 # 02 Y:2014 | 02 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,404 | $10,529 | Not Implemented |
OR0637 # 03 Y:2014 | 03 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,677 | $1,971 | Not Implemented |
OR0636 # 01 Y:2014 | 01 | 2014 | IMPROVE COMBUSTION CONTROL CAPABILITY | $31,057 | $7,123 | Not Implemented |
OR0636 # 02 Y:2014 | 02 | 2014 | UPGRADE OBSOLETE EQUIPMENT | $55,473 | $50,000 | Not Implemented |
OR0636 # 03 Y:2014 | 03 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,708 | $7,000 | Implemented |
OR0636 # 04 Y:2014 | 04 | 2014 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $27,166 | $37,500 | Not Implemented |
OR0636 # 05 Y:2014 | 05 | 2014 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $712,265 | $3,300,000 | Not Implemented |