IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,568

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0640 # 01 Y:2014 01 2014 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $131,605 $242,261 Implemented
OR0640 # 02 Y:2014 02 2014 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,455 $0 Not Implemented
OR0640 # 03 Y:2014 03 2014 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,298 $1,020 Not Implemented
OR0640 # 04 Y:2014 04 2014 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $20,241 $67,550 Not Implemented
OR0640 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,092 $12,092 Implemented
OR0639 # 01 Y:2014 01 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $14,677 $12,315 Implemented
OR0639 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,461 $360 Implemented
OR0639 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,572 $7,500 Not Implemented
OR0639 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $7,377 $7,643 Implemented
OR0639 # 05 Y:2014 05 2014 OPTIMIZE PLANT POWER FACTOR $3,528 $15,201 Not Implemented
OR0638 # 01 Y:2014 01 2014 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $237,276 $62,840 Not Implemented
OR0638 # 02 Y:2014 02 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $28,255 $27,375 Not Implemented
OR0638 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,466 $8,550 Not Implemented
OR0638 # 04 Y:2014 04 2014 MINIMIZE WATER USAGE $1,003 $0 Implemented
OR0638 # 05 Y:2014 05 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,008 $9,020 Not Implemented
OR0638 # 06 Y:2014 06 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $40,207 $13,800 Not Implemented
OR0638 # 07 Y:2014 07 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,180 $10,000 Implemented
OR0637 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,883 $750 Not Implemented
OR0637 # 02 Y:2014 02 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,404 $10,529 Not Implemented
OR0637 # 03 Y:2014 03 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,677 $1,971 Not Implemented
OR0636 # 01 Y:2014 01 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $31,057 $7,123 Not Implemented
OR0636 # 02 Y:2014 02 2014 UPGRADE OBSOLETE EQUIPMENT $55,473 $50,000 Not Implemented
OR0636 # 03 Y:2014 03 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,708 $7,000 Implemented
OR0636 # 04 Y:2014 04 2014 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $27,166 $37,500 Not Implemented
OR0636 # 05 Y:2014 05 2014 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $712,265 $3,300,000 Not Implemented