IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0151 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,969 $1,000 Not Implemented
UU0151 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,157 $1,000 Not Implemented
UU0151 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $1,973 $7,800 Not Implemented
UU0151 # 07 Y:2019 07 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,760 $100 Not Implemented
UU0149 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,874 $9,432 Not Implemented
UU0149 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,611 $1,000 Not Implemented
UU0149 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,173 $120 Not Implemented
UU0149 # 04 Y:2019 04 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,980 $0 Not Implemented
UU0149 # 05 Y:2019 05 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,945 $200 Not Implemented
UU0149 # 06 Y:2019 06 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $824 $1,208 Not Implemented
UU0149 # 07 Y:2019 07 2019 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $797 $1,990 Not Implemented
UU0149 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $495 $286 Not Implemented
UU0149 # 09 Y:2019 09 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $391 $300 Not Implemented
UU0149 # 10 Y:2019 10 2019 INSTALL OCCUPANCY SENSORS $322 $402 Not Implemented
UU0148 # 01 Y:2019 01 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $4,526,086 $11,242,113 Not Implemented
UU0148 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $292,277 $82,400 Implemented
UU0148 # 03 Y:2019 03 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $205,559 $25,240 Implemented
UU0148 # 04 Y:2019 04 2019 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $21,723 $100,000 Not Implemented
UU0148 # 05 Y:2019 05 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,445 $308 Not Implemented
UU0148 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,667 $8,267 Implemented
UU0144 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $42,296 $1,068 Implemented
UU0144 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $16,349 $400 Implemented
UU0144 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $6,190 $6,000 Not Implemented
UU0144 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,420 $128 Implemented
UU0143 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $100 Implemented