IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0599 # 09 Y:2000 09 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $872 $500 Not Implemented
UD0598 # 01 Y:2000 01 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $1,210,579 $375,000 Not Implemented
UD0598 # 02 Y:2000 02 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $22,073 $34,288 Implemented
UD0598 # 03 Y:2000 03 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $15,756 $18,000 Not Implemented
UD0598 # 04 Y:2000 04 2000 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS $13,603 $0 Not Implemented
UD0598 # 05 Y:2000 05 2000 CHECK FOR ACCURACY OF UTILITY / POWER METERS $9,640 $0 Implemented
UD0598 # 06 Y:2000 06 2000 USE MINIMUM STEAM OPERATING PRESSURE $3,333 $0 Implemented
UD0598 # 07 Y:2000 07 2000 INSTALL OCCUPANCY SENSORS $1,752 $726 Not Implemented
UD0598 # 08 Y:2000 08 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,720 $500 Implemented
UD0598 # 09 Y:2000 09 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,088 $4,253 Implemented
UD0597 # 01 Y:2000 01 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $42,147 $0 Not Implemented
UD0597 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,291 $1,360 Implemented
UD0597 # 03 Y:2000 03 2000 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,289 $1,400 Not Implemented
UD0597 # 04 Y:2000 04 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,800 $3,000 Implemented
UD0596 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,230 $60,000 Not Implemented
UD0596 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,200 $27,423 Implemented
UD0596 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $4,221 $1,200 Implemented
UD0596 # 04 Y:2000 04 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,651 $1,298 Not Implemented
UD0596 # 05 Y:2000 05 2000 INSTALL TIMERS AND/OR THERMOSTATS $2,699 $3,072 Not Implemented
UD0595 # 01 Y:2000 01 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $330,000 $0 Not Implemented
UD0595 # 02 Y:2000 02 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $96,096 $106,000 Not Implemented
UD0595 # 03 Y:2000 03 2000 CONDENSE OPERATION INTO ONE BUILDING $14,451 $5,000 Not Implemented
UD0595 # 04 Y:2000 04 2000 REDUCE SCRAP PRODUCTION $11,016 $20,400 Not Implemented
UD0595 # 05 Y:2000 05 2000 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,851 $2,000 Not Implemented
UD0595 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $846 Not Implemented