IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,592

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0212 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $634 $495 Not Implemented
DL0212 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $5,199 $6,100 Not Implemented
DL0212 # 05 Y:2022 05 2022 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,655 $5,200 Not Implemented
DL0212 # 06 Y:2022 06 2022 USE OPTIMUM THICKNESS INSULATION $692 $2,233 Not Implemented
DL0212 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,396 $21,500 Not Implemented
DL0212 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,587 $13,450 Not Implemented
DL0212 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $278 $210 Not Implemented
DL0212 # 10 Y:2022 10 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,304 $22,424 Not Implemented
NL0073 # 01 Y:2022 01 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $16,217 $225,000 Implemented
NL0073 # 02 Y:2022 02 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,537 $35,000 Implemented
NL0073 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,239 $1,398 Not Implemented
NL0073 # 04 Y:2022 04 2022 USE OTHER WASTE CONCENTRATION METHODS $1,144 $1,258 Implemented
NL0073 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $772 $58 Implemented
TT0281 # 01 Y:2022 01 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $58,911 $10,000 n/a
TT0281 # 02 Y:2022 02 2022 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $24,436 $109,567 n/a
TT0281 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $12,034 $44,013 n/a
TT0281 # 04 Y:2022 04 2022 AIR CONDITION ONLY SPACE NECESSARY $5,133 $6,000 n/a
TT0281 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,821 $4,500 n/a
TT0281 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,419 $2,740 n/a
TT0281 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,188 $560 n/a
TT0281 # 08 Y:2022 08 2022 INSULATE BARE EQUIPMENT $1,876 $2,748 n/a
TT0281 # 09 Y:2022 09 2022 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,000 $25 n/a
TT0281 # 10 Y:2022 10 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $408 $63 n/a
CO0745 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,752 $0 n/a
CO0745 # 03 Y:2022 03 2022 USE OPTIMUM TEMPERATURE $10,067 $0 n/a