IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,855

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MUCM10 # 03 Y:2023 03 2023 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $5,210 $600 Not Implemented
MUCM10 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,480 $3,150 Not Implemented
MUCM10 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $23 $14 Not Implemented
MUCM10 # 06 Y:2023 06 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $38 $36 Not Implemented
MUCM10 # 07 Y:2023 07 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,177 $4,350 Not Implemented
MUCM10 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $366 $1,749 Not Implemented
MUCM10 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $54 $33 Not Implemented
MUCM10 # 10 Y:2023 10 2023 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $332 $648 Not Implemented
MUCM10 # 11 Y:2023 11 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,533 $5,241 Not Implemented
LE0546 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,482 $4,500 Not Implemented
LE0546 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $43,220 $20,000 Not Implemented
LE0546 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,997 $20,300 Not Implemented
LE0546 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,746 $72,400 Not Implemented
LE0546 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,099 $2,000 Not Implemented
LE0546 # 06 Y:2023 06 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,194 $40,000 Not Implemented
LE0546 # 07 Y:2023 07 2023 INSTALL TIMERS AND/OR THERMOSTATS $15,770 $50,000 Not Implemented
LE0546 # 08 Y:2023 08 2023 OPTIMIZE PLANT POWER FACTOR $5,440 $23,030 Not Implemented
LE0546 # 09 Y:2023 09 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,528 $27,000 Not Implemented
WM0199 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,795 $44,389 Implemented
WM0199 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,348 $0 Not Implemented
WM0199 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,889 $2,175 Not Implemented
WM0199 # 04 Y:2023 04 2023 USE COMPRESSOR AIR FILTERS $1,447 $2,189 Implemented
WM0199 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,125 $1,662 Not Implemented
WV0642 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,969 $55,520 Not Implemented
WV0642 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,931 $31,118 Not Implemented