Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160,855
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MUCM10 # 03 Y:2023 | 03 | 2023 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $5,210 | $600 | Not Implemented |
MUCM10 # 04 Y:2023 | 04 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,480 | $3,150 | Not Implemented |
MUCM10 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $23 | $14 | Not Implemented |
MUCM10 # 06 Y:2023 | 06 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $38 | $36 | Not Implemented |
MUCM10 # 07 Y:2023 | 07 | 2023 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,177 | $4,350 | Not Implemented |
MUCM10 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $366 | $1,749 | Not Implemented |
MUCM10 # 09 Y:2023 | 09 | 2023 | INSTALL OCCUPANCY SENSORS | $54 | $33 | Not Implemented |
MUCM10 # 10 Y:2023 | 10 | 2023 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $332 | $648 | Not Implemented |
MUCM10 # 11 Y:2023 | 11 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,533 | $5,241 | Not Implemented |
LE0546 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,482 | $4,500 | Not Implemented |
LE0546 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $43,220 | $20,000 | Not Implemented |
LE0546 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,997 | $20,300 | Not Implemented |
LE0546 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,746 | $72,400 | Not Implemented |
LE0546 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,099 | $2,000 | Not Implemented |
LE0546 # 06 Y:2023 | 06 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $14,194 | $40,000 | Not Implemented |
LE0546 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $15,770 | $50,000 | Not Implemented |
LE0546 # 08 Y:2023 | 08 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,440 | $23,030 | Not Implemented |
LE0546 # 09 Y:2023 | 09 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,528 | $27,000 | Not Implemented |
WM0199 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,795 | $44,389 | Implemented |
WM0199 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,348 | $0 | Not Implemented |
WM0199 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,889 | $2,175 | Not Implemented |
WM0199 # 04 Y:2023 | 04 | 2023 | USE COMPRESSOR AIR FILTERS | $1,447 | $2,189 | Implemented |
WM0199 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,125 | $1,662 | Not Implemented |
WV0642 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,969 | $55,520 | Not Implemented |
WV0642 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,931 | $31,118 | Not Implemented |