IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,855

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0423 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,513 $51,984 Implemented
MI0423 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,808 $580 Implemented
MI0423 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,785 $37,678 Implemented
MI0423 # 05 Y:2023 05 2023 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,196 $27,500 Not Implemented
MI0423 # 06 Y:2023 06 2023 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $6,580 $1,455 Not Implemented
MI0423 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $4,508 $1,250 Implemented
MI0423 # 08 Y:2023 08 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,131 $1,500 Implemented
MI0423 # 09 Y:2023 09 2023 AIR CONDITION ONLY SPACE NECESSARY $1,771 $900 Not Implemented
MI0423 # 10 Y:2023 10 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $277 $1,360 Implemented
CI0009 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $46,339 $196,478 n/a
CI0009 # 02 Y:2023 02 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,591 $41,000 n/a
CI0009 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,199 $1,500 n/a
CI0009 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,281 $14,880 n/a
CI0009 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,574 $0 n/a
CI0009 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $4,832 $4,725 n/a
CI0009 # 07 Y:2023 07 2023 USE PHOTOCELL CONTROLS $4,055 $2,500 n/a
UU0218 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $8,860 $4,445 Not Implemented
UU0218 # 02 Y:2023 02 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $7,404 $5,700 Implemented
UU0218 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,223 $53,198 Implemented
UU0218 # 04 Y:2023 04 2023 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $3,088 $3,300 Not Implemented
UU0218 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $2,944 $78,979 Not Implemented
UU0218 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,861 $721 Implemented
UU0218 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $512 $161 Implemented
GT0965 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $23,363 $800 Not Implemented
GT0965 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,014 $1,850 Implemented