IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,855

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0037 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $62,708 $9,722 Implemented
TR0037 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,119 $1,204 Implemented
TR0037 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $4,104 $9,500 Implemented
TR0037 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $210,765 $1,396,349 Not Implemented
TR0040 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,084 $4,166 Implemented
TR0040 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $11,309 $128,100 Not Implemented
TR0040 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,078 $15,000 Implemented
NT0003 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,267 $5,705 Not Implemented
NT0003 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $12,262 $21,725 Not Implemented
NT0003 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,623 $24,707 Not Implemented
NT0003 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $3,289 $1,600 Not Implemented
NT0003 # 05 Y:2023 05 2023 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $2,238 $3,193 Not Implemented
NT0003 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,020 $185,220 Not Implemented
IP0171 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,033 $0 Not Implemented
IP0171 # 02 Y:2023 02 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,240 $0 Not Implemented
IP0171 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,706 $517 Not Implemented
IP0171 # 04 Y:2023 04 2023 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $261 $38 Not Implemented
IP0171 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,539 $915 Not Implemented
IP0171 # 06 Y:2023 06 2023 RECOVER WASTE HEAT FROM EQUIPMENT $4,171 $1,316 Not Implemented
IP0171 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,840 $69,000 Not Implemented
IP0171 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $117 $499 Not Implemented
IP0171 # 09 Y:2023 09 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $128 $600 Not Implemented
KS2315 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,991 $5,960 Implemented
KS2315 # 02 Y:2023 02 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $33,086 $235,752 Implemented
KS2315 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,175 $24,588 Implemented