IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,577

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2212 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,936 $19,500 Not Implemented
UL2212 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $34,406 $237,031 Not Implemented
UL2212 # 05 Y:2022 05 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,902 $63,000 Not Implemented
UW2207 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,161 $0 Implemented
UW2207 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $112 Implemented
UW2207 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,582 $12,124 Not Implemented
UW2207 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,631 $2,080 Implemented
MUCM05 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,550 $0 Not Implemented
MUCM05 # 02 Y:2022 02 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $40 $0 Not Implemented
MUCM05 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,312 $0 Not Implemented
MUCM05 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $495 $0 Not Implemented
MUCM05 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $2,554 $0 Implemented
MUCM05 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $250 $195 Not Implemented
MUCM05 # 07 Y:2022 07 2022 USE PHOTOCELL CONTROLS $297 $1,146 Not Implemented
UW2206 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,718 $0 Implemented
UW2206 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $567 $122 Implemented
UW2206 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $2,199 Implemented
UW2206 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,058 $2,080 Implemented
UW2206 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $782 $0 Implemented
UF0585 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,858 $44,939 Implemented
UF0585 # 02 Y:2022 02 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $11,758 $1,342 Implemented
UF0585 # 03 Y:2022 03 2022 INSTALL TURBULATORS $6,811 $7,500 Implemented
UF0585 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,918 $756 Implemented
UF0585 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,345 $0 Implemented
UF0585 # 06 Y:2022 06 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $45,977 $0 Implemented