IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0555 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,882 $17,546 Implemented
UD0554 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $101,400 $60,000 Not Implemented
UD0554 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $47,736 $2,000 Not Implemented
UD0554 # 03 Y:1998 03 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $28,560 $8,000 Implemented
UD0554 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $19,707 $21,120 Not Implemented
UD0554 # 05 Y:1998 05 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $4,026 $1,850 Implemented
UD0554 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,699 $6,419 Not Implemented
UD0554 # 07 Y:1998 07 1998 COVER OPEN TANKS $2,023 $1,050 Implemented
UD0553 # 01 Y:1998 01 1998 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $21,875 $500 Not Implemented
UD0553 # 02 Y:1998 02 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $14,410 $12,100 Not Implemented
UD0553 # 03 Y:1998 03 1998 USE PLASTIC PALLETS INSTEAD OF WOOD $5,600 $0 Not Implemented
UD0553 # 04 Y:1998 04 1998 INSTALL COMMON HEADER ON COMPRESSORS $12,000 $2,000 Not Implemented
UD0553 # 05 Y:1998 05 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,947 $10,000 Not Implemented
UD0553 # 06 Y:1998 06 1998 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $8,274 $1,000 Not Implemented
UD0553 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,594 $13,677 Not Implemented
UD0553 # 08 Y:1998 08 1998 UPGRADE CONTROLS ON COMPRESSORS $5,271 $800 Implemented
UM0123 # 03 Y:1998 03 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,709 $6,300 Not Implemented
UM0123 # 04 Y:1998 04 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,138 $4,120 Not Implemented
UM0123 # 05 Y:1998 05 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $812 $800 Not Implemented
UM0123 # 06 Y:1998 06 1998 METER WASTE WATER $599 $900 Not Implemented
UM0123 # 07 Y:1998 07 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $5,200 $100 Not Implemented
UM0123 # 08 Y:1998 08 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $4,161 $200 Not Implemented
UM0123 # 01 Y:1998 01 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,378 $2,188 Not Implemented
UM0123 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,806 $500 Not Implemented
UD0552 # 01 Y:1998 01 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $199,687 $0 Not Implemented