IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,980

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0128 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $2,650 $1,000 Not Implemented
UM0128 # 04 Y:1999 04 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,800 $0 Not Implemented
UM0128 # 05 Y:1999 05 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $13,800 $0 Not Implemented
UM0128 # 06 Y:1999 06 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $47,700 $20,000 Not Implemented
UM0128 # 07 Y:1999 07 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $16,635 $450 Not Implemented
UD0559 # 01 Y:1998 01 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $18,360 $25,000 Not Implemented
UD0559 # 02 Y:1998 02 1998 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $13,770 $5,000 Implemented
UD0559 # 03 Y:1998 03 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,474 $0 Not Implemented
UD0559 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,779 $454 Not Implemented
UD0559 # 05 Y:1998 05 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $3,469 $0 Implemented
UD0559 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,782 $500 Implemented
UD0559 # 07 Y:1998 07 1998 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,752 $2,000 Not Implemented
UD0559 # 08 Y:1998 08 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,492 $1,060 Not Implemented
UD0559 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,288 $0 Implemented
UD0558 # 01 Y:1998 01 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,790 $8,000 Implemented
UD0558 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,343 $45,360 Implemented
UD0558 # 03 Y:1998 03 1998 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $7,068 $7,600 Not Implemented
UD0558 # 04 Y:1998 04 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,453 $8,000 Implemented
UD0558 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,200 $0 Implemented
UD0557 # 01 Y:1998 01 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $42,942 $12,000 Implemented
UD0557 # 02 Y:1998 02 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $60,203 $0 Implemented
UD0557 # 03 Y:1998 03 1998 RECYCLE CLEANING SOLVENT AND REUSE $9,078 $0 Not Implemented
UD0557 # 04 Y:1998 04 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,643 $1,440 Not Implemented
UD0557 # 05 Y:1998 05 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,636 $6,680 Not Implemented
UD0557 # 06 Y:1998 06 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,778 $0 Not Implemented