Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160,855
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2302 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $136 | $461 | Not Implemented |
UC2302 # 07 Y:2023 | 07 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,091 | $431 | Not Implemented |
UC2302 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,690 | $2,800 | Not Implemented |
UC2302 # 09 Y:2023 | 09 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $13,123 | $2,864 | Not Implemented |
TR0038 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $337 | $921 | Implemented |
TR0038 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $303 | $583 | Implemented |
TR0038 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $251 | $195 | Not Implemented |
TR0038 # 04 Y:2022 | 04 | 2022 | MAINTAIN MACHINES TO REDUCE LEAKS | $717 | $884 | Implemented |
TR0038 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $419 | $4,300 | Not Implemented |
AM0876 # 01 Y:2023 | 01 | 2023 | USE SYNTHETIC LUBRICANT | $1,823 | $0 | Not Implemented |
AM0876 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,373 | $63 | Implemented |
AM0876 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $25,280 | $4,875 | Not Implemented |
AM0876 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $20,029 | $25,217 | Implemented |
MS0411 # 01 Y:2023 | 01 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $16,956 | $42,807 | n/a |
MS0411 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $113 | $335 | n/a |
MS0411 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,198 | $786,625 | n/a |
MS0411 # 04 Y:2023 | 04 | 2023 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $4,180 | $4,512 | n/a |
MS0411 # 05 Y:2023 | 05 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $537 | $3,690 | n/a |
IP0170 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,367 | $0 | Not Implemented |
IP0170 # 02 Y:2023 | 02 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,771 | $0 | Not Implemented |
IP0170 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,876 | $495 | Not Implemented |
IP0170 # 04 Y:2023 | 04 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,289 | $660 | Not Implemented |
IP0170 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,696 | $4,266 | Not Implemented |
IP0170 # 06 Y:2023 | 06 | 2023 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $590 | $113 | Not Implemented |
IP0170 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $140 | $33 | Not Implemented |