IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0420 # 04 Y:1993 04 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,840 $0 Not Implemented
UD0420 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,048 $2,456 Implemented
UD0420 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,897 $3,000 Implemented
UD0420 # 07 Y:1993 07 1993 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $26,098 $0 Not Implemented
GT0514 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,380 $14,150 Implemented
GT0514 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,010 $7,520 Implemented
GT0514 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,450 $900 Implemented
GT0514 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,600 $10,000 Not Implemented
GT0514 # 05 Y:1993 05 1993 OPTIMIZE PLANT POWER FACTOR $16,240 $25,000 Implemented
GT0514 # 06 Y:1993 06 1993 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $13,150 $40,000 Not Implemented
GT0514 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,860 $17,100 Not Implemented
OK0422 # 01 Y:1993 01 1993 REPAIR OR REPLACE STEAM TRAPS $170,442 $0 Implemented
OK0422 # 02 Y:1993 02 1993 INCREASE AMOUNT OF CONDENSATE RETURNED $126,322 $90,000 Implemented
OK0422 # 03 Y:1993 03 1993 REPAIR OR REPLACE STEAM TRAPS $106,473 $4,025 Implemented
OK0422 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,188 $4,152 Implemented
OK0422 # 05 Y:1993 05 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,201 $7,220 Not Implemented
OK0422 # 06 Y:1993 06 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $671 $866 Implemented
UD0419 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $19,715 $13,400 Implemented
UD0419 # 02 Y:1993 02 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $602 $0 Not Implemented
UD0419 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,741 $2,000 Not Implemented
UD0419 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,200 $5,739 Implemented
UD0419 # 05 Y:1993 05 1993 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $81,110 $0 Implemented
UD0419 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $27,720 $60,000 Not Implemented
UD0419 # 07 Y:1993 07 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $89,581 $20,000 Implemented
IA0072 # 11 Y:1993 11 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $360 Not Implemented