Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0711 # 01 Y:2018 | 01 | 2018 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $1,082,323 | $800,001 | Not Implemented |
OR0711 # 02 Y:2018 | 02 | 2018 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $68,286 | $68,224 | Not Implemented |
OR0711 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,749 | $10,303 | Not Implemented |
OR0711 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,277 | $1,904 | Not Implemented |
OR0711 # 05 Y:2018 | 05 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,097 | $30,240 | Not Implemented |
UA0201 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $68,748 | $22,020 | Implemented |
UA0201 # 02 Y:2018 | 02 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $29,283 | $1,000 | Implemented |
UA0201 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $219,409 | $450,000 | Not Implemented |
UA0201 # 04 Y:2018 | 04 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $100,960 | $47,000 | Implemented |
UA0201 # 05 Y:2018 | 05 | 2018 | INSULATE BARE EQUIPMENT | $35,781 | $56,161 | Not Implemented |
UA0201 # 06 Y:2018 | 06 | 2018 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $588 | $278 | Implemented |
MI0345 # 08 Y:2018 | 08 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $785 | $1,560 | Not Implemented |
MI0345 # 07 Y:2018 | 07 | 2018 | OPTIMIZE PLANT POWER FACTOR | $810 | $2,138 | Not Implemented |
MI0345 # 06 Y:2018 | 06 | 2018 | USE SOLAR HEAT TO HEAT WATER | $1,166 | $2,755 | Implemented |
MI0345 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $1,380 | $540 | Implemented |
MI0345 # 04 Y:2018 | 04 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,410 | $1,982 | Not Implemented |
MI0345 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,576 | $3,443 | Implemented |
MI0345 # 02 Y:2018 | 02 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,837 | $3,204 | Implemented |
MI0345 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,969 | $3,100 | Implemented |
WV0568 # 05 Y:2018 | 05 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $73,200 | $3,000 | Not Implemented |
WV0568 # 04 Y:2018 | 04 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,251 | $562 | Implemented |
WV0568 # 03 Y:2018 | 03 | 2018 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $3,286 | $3,400 | Implemented |
WV0568 # 02 Y:2018 | 02 | 2018 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $9,840 | $2,800 | Implemented |
WV0568 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,605 | $52,080 | Not Implemented |
GT0919 # 06 Y:2018 | 06 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $90,950 | $1,944,000 | Implemented |