IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0517 # 04 Y:1997 04 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $246 $0 Implemented
UD0517 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $151 $20 Implemented
UD0516 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,109 $14,870 Not Implemented
UD0516 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,524 $8,150 Implemented
UD0516 # 03 Y:1997 03 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,785 $1,200 Not Implemented
UD0516 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,205 $978 Implemented
UD0516 # 05 Y:1997 05 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,669 $500 Not Implemented
UD0515 # 01 Y:1997 01 1997 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $36,109 $60,000 Implemented
UD0515 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,688 $11,020 Not Implemented
UD0515 # 03 Y:1997 03 1997 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES $34,031 $25,000 Not Implemented
UD0515 # 04 Y:1997 04 1997 MOVE PRODUCT USING MECHANICAL MEANS $67,125 $2,500 Not Implemented
UD0515 # 05 Y:1997 05 1997 MOVE PRODUCT USING MECHANICAL MEANS $19,500 $8,000 Not Implemented
UD0515 # 06 Y:1997 06 1997 USE OTHER METHODS FOR NEUTRALIZATION $5,655 $500 Not Implemented
UD0515 # 07 Y:1997 07 1997 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,789 $200 Implemented
UD0515 # 08 Y:1997 08 1997 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $1,875 $0 Not Implemented
UD0515 # 09 Y:1997 09 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,143 $150,000 Implemented
UD0514 # 01 Y:1997 01 1997 UPGRADE CONTROLS ON COMPRESSORS $1,963 $4,000 Implemented
UD0514 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,322 $8,719 Implemented
UD0514 # 03 Y:1997 03 1997 OPTIMIZE PLANT POWER FACTOR $1,731 $150 Not Implemented
UD0514 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $756 $2,099 Implemented
UD0514 # 05 Y:1997 05 1997 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $1,589 $1,000 Not Implemented
UD0514 # 06 Y:1997 06 1997 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $13,703 $1,600 Not Implemented
UD0514 # 07 Y:1997 07 1997 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $23,470 $200 Implemented
UD0514 # 08 Y:1997 08 1997 MOVE PRODUCT USING MECHANICAL MEANS $71,600 $21,000 Implemented
UD0514 # 09 Y:1997 09 1997 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $8,400 $10,000 Implemented