Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0248 # 02 Y:1995 | 02 | 1995 | OPTIMIZE PLANT POWER FACTOR | $8,584 | $8,750 | Not Implemented |
AM0248 # 03 Y:1995 | 03 | 1995 | INSULATE BARE EQUIPMENT | $1,020 | $290 | Implemented |
AM0248 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $750 | $200 | Implemented |
AM0248 # 05 Y:1995 | 05 | 1995 | UPGRADE OBSOLETE EQUIPMENT | $790 | $655 | Implemented |
AM0248 # 06 Y:1995 | 06 | 1995 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $350 | $0 | Implemented |
AM0248 # 07 Y:1995 | 07 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $310 | $500 | Implemented |
AM0248 # 08 Y:1995 | 08 | 1995 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $38,980 | $40,000 | Implemented |
AM0248 # 09 Y:1995 | 09 | 1995 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $8,550 | $19,700 | Implemented |
AM0248 # 10 Y:1995 | 10 | 1995 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $340 | $0 | Implemented |
KG0030 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,705 | $19,230 | Implemented |
KG0030 # 02 Y:1995 | 02 | 1995 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,534 | $2,850 | Implemented |
KG0030 # 03 Y:1995 | 03 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,624 | $2,518 | Implemented |
KG0030 # 04 Y:1995 | 04 | 1995 | AIR CONDITION ONLY SPACE NECESSARY | $3,434 | $5,070 | Implemented |
KG0030 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,427 | $780 | Implemented |
KG0030 # 06 Y:1995 | 06 | 1995 | INSTALL TIMERS AND/OR THERMOSTATS | $2,297 | $750 | Not Implemented |
KG0030 # 07 Y:1995 | 07 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $664 | $1,500 | Not Implemented |
AR0055 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,899 | $4,070 | Implemented |
AR0055 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $481 | $347 | Implemented |
AR0055 # 03 Y:1995 | 03 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $185 | $0 | Implemented |
AR0055 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $259 | $200 | Implemented |
AR0055 # 05 Y:1995 | 05 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $451 | $30 | Implemented |
AR0055 # 06 Y:1995 | 06 | 1995 | RECOVER AND REUSE WASTE MATERIAL | $86,461 | $51,250 | Not Implemented |
KG0029 # 01 Y:1995 | 01 | 1995 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $27,964 | $682 | Implemented |
KG0029 # 02 Y:1995 | 02 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,307 | $3,000 | Implemented |
KG0029 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $966 | $353 | Implemented |