Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0609 # 02 Y:2013 | 02 | 2013 | INSULATE BARE EQUIPMENT | $4,347 | $4,299 | Not Implemented |
OR0609 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,555 | $4,200 | Not Implemented |
OR0609 # 04 Y:2013 | 04 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $6,499 | $5,792 | Not Implemented |
OR0609 # 05 Y:2013 | 05 | 2013 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $4,900 | $4,480 | Not Implemented |
OR0609 # 06 Y:2013 | 06 | 2013 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $142,102 | $374,500 | Not Implemented |
OR0609 # 07 Y:2013 | 07 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $117,782 | $160,770 | Implemented |
OR0609 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,018 | $5,875 | Not Implemented |
OR0609 # 09 Y:2013 | 09 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $28,299 | $42,000 | Not Implemented |
OR0608 # 01 Y:2013 | 01 | 2013 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $32,340 | $0 | Implemented |
OR0608 # 02 Y:2013 | 02 | 2013 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $107,138 | $55,641 | Implemented |
OR0608 # 03 Y:2013 | 03 | 2013 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $125,546 | $300,000 | Not Implemented |
OR0608 # 04 Y:2013 | 04 | 2013 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $11,970 | $41,000 | Not Implemented |
OR0608 # 05 Y:2013 | 05 | 2013 | INSULATE BARE EQUIPMENT | $518 | $135 | Not Implemented |
OR0608 # 06 Y:2013 | 06 | 2013 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $2,698 | $1,220 | Not Implemented |
OR0608 # 07 Y:2013 | 07 | 2013 | USE PHOTOCELL CONTROLS | $658 | $966 | Not Implemented |
OR0607 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $52,535 | $27,268 | Not Implemented |
OR0607 # 02 Y:2013 | 02 | 2013 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,626 | $5,352 | Not Implemented |
OR0607 # 03 Y:2013 | 03 | 2013 | OPTIMIZE PLANT POWER FACTOR | $3,603 | $9,150 | Not Implemented |
OR0607 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,983 | $7,504 | Implemented |
OR0607 # 05 Y:2013 | 05 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,021 | $5,130 | Implemented |
OR0604 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,634 | $500 | Implemented |
OR0604 # 02 Y:2013 | 02 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $144,955 | $110,000 | Not Implemented |
OR0604 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $53,512 | $43,218 | Not Implemented |
OR0604 # 04 Y:2013 | 04 | 2013 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $13,502 | $5,712 | Not Implemented |
OR0604 # 05 Y:2013 | 05 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $11,228 | $11,850 | Implemented |