IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,568

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0609 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $4,347 $4,299 Not Implemented
OR0609 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,555 $4,200 Not Implemented
OR0609 # 04 Y:2013 04 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $6,499 $5,792 Not Implemented
OR0609 # 05 Y:2013 05 2013 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,900 $4,480 Not Implemented
OR0609 # 06 Y:2013 06 2013 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $142,102 $374,500 Not Implemented
OR0609 # 07 Y:2013 07 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $117,782 $160,770 Implemented
OR0609 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,018 $5,875 Not Implemented
OR0609 # 09 Y:2013 09 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $28,299 $42,000 Not Implemented
OR0608 # 01 Y:2013 01 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $32,340 $0 Implemented
OR0608 # 02 Y:2013 02 2013 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $107,138 $55,641 Implemented
OR0608 # 03 Y:2013 03 2013 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $125,546 $300,000 Not Implemented
OR0608 # 04 Y:2013 04 2013 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $11,970 $41,000 Not Implemented
OR0608 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $518 $135 Not Implemented
OR0608 # 06 Y:2013 06 2013 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $2,698 $1,220 Not Implemented
OR0608 # 07 Y:2013 07 2013 USE PHOTOCELL CONTROLS $658 $966 Not Implemented
OR0607 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $52,535 $27,268 Not Implemented
OR0607 # 02 Y:2013 02 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,626 $5,352 Not Implemented
OR0607 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $3,603 $9,150 Not Implemented
OR0607 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,983 $7,504 Implemented
OR0607 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,021 $5,130 Implemented
OR0604 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,634 $500 Implemented
OR0604 # 02 Y:2013 02 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $144,955 $110,000 Not Implemented
OR0604 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $53,512 $43,218 Not Implemented
OR0604 # 04 Y:2013 04 2013 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $13,502 $5,712 Not Implemented
OR0604 # 05 Y:2013 05 2013 UPGRADE CONTROLS ON COMPRESSORS $11,228 $11,850 Implemented