IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,224

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0636 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,950 $6,500 Not Implemented
GT0636 # 08 Y:1998 08 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $825,000 $0 Not Implemented
TN0622 # 01 Y:1998 01 1998 REDUCE SCRAP PRODUCTION $54,000 $34,400 Not Implemented
TN0622 # 02 Y:1998 02 1998 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $28,700 $17,200 Not Implemented
TN0622 # 03 Y:1998 03 1998 MODIFY CURRENT INCENTIVE PROGRAM $25,000 $10,000 Not Implemented
TN0622 # 04 Y:1998 04 1998 INSTALL TIMERS AND/OR THERMOSTATS $2,750 $780 Not Implemented
TN0622 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $745 $0 Implemented
TN0622 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $225 Not Implemented
TN0622 # 07 Y:1998 07 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $340 $0 Not Implemented
GT0628 # 01 Y:1997 01 1997 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $86,500 $120,000 n/a
GT0628 # 02 Y:1997 02 1997 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $186,200 $245,000 n/a
GT0628 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,903 $37,960 n/a
GT0628 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $4,263 $5,550 n/a
GT0628 # 05 Y:1997 05 1997 MINIMIZE WATER USAGE $2,924 $0 n/a
GT0628 # 06 Y:1997 06 1997 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $23,066 $72,100 n/a
GT0628 # 07 Y:1997 07 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $37,000 $0 n/a
NC0113 # 01 Y:1997 01 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,733 $15,000 Not Implemented
NC0113 # 02 Y:1997 02 1997 REVISE SMOKE CLEANUP FROM OPERATIONS $1,447 $3,400 Not Implemented
NC0113 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $252 $240 Not Implemented
NC0113 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $863 $210 Implemented
NC0113 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $226 $1,400 Not Implemented
NC0113 # 06 Y:1997 06 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $831 $500 Not Implemented
NC0113 # 07 Y:1997 07 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $5,500 $5,200 Not Implemented
NC0113 # 08 Y:1997 08 1997 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $163,000 $8,000 Not Implemented
NC0113 # 09 Y:1997 09 1997 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $11,000 $10,500 Not Implemented