Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0532 # 04 Y:2003 | 04 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,160 | $4,000 | Not Implemented |
CO0532 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $110 | Implemented |
CO0532 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $139 | $139 | Implemented |
SF0270 # 01 Y:2003 | 01 | 2003 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,671 | $0 | Not Implemented |
SF0270 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $244 | $0 | Not Implemented |
SF0270 # 03 Y:2003 | 03 | 2003 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $9,405 | $4,145 | Not Implemented |
SF0270 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,226 | $9,485 | Implemented |
SF0270 # 05 Y:2003 | 05 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,081 | $830 | Not Implemented |
SF0270 # 06 Y:2003 | 06 | 2003 | INSTALL SKYLIGHTS | $3,975 | $10,800 | Implemented |
SF0270 # 07 Y:2003 | 07 | 2003 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $3,034 | $0 | Not Implemented |
SF0270 # 08 Y:2003 | 08 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $9,418 | $9,500 | Not Implemented |
SF0270 # 09 Y:2003 | 09 | 2003 | ADOPT IN-HOUSE MATERIAL GENERATION | $15,179 | $80,393 | Not Implemented |
OR0441 # 01 Y:2003 | 01 | 2003 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $65,260 | $70,100 | Implemented |
OR0441 # 02 Y:2003 | 02 | 2003 | SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE | $18,970 | $2,160 | Implemented |
OR0441 # 03 Y:2003 | 03 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,670 | $985 | Implemented |
OR0441 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,900 | $10,080 | Implemented |
OR0440 # 01 Y:2003 | 01 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,842,800 | $348,000 | Implemented |
OR0440 # 02 Y:2003 | 02 | 2003 | MOVE PRODUCT USING MECHANICAL MEANS | $15,000 | $75 | Not Implemented |
OR0440 # 03 Y:2003 | 03 | 2003 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,500 | $5,130 | Implemented |
OR0440 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,500 | $0 | Not Implemented |
OR0440 # 05 Y:2003 | 05 | 2003 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $2,600 | $700 | Implemented |
OR0440 # 06 Y:2003 | 06 | 2003 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $765 | $1,300 | Not Implemented |
OR0440 # 07 Y:2003 | 07 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,500 | $38,200 | Implemented |
NC0268 # 01 Y:2003 | 01 | 2003 | AUTOMATE FINISHING PROCESS | $29,974 | $26,350 | Not Implemented |
NC0268 # 02 Y:2003 | 02 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $9,563 | $8,000 | Not Implemented |