IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0532 # 04 Y:2003 04 2003 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,160 $4,000 Not Implemented
CO0532 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $110 Implemented
CO0532 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $139 $139 Implemented
SF0270 # 01 Y:2003 01 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,671 $0 Not Implemented
SF0270 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $244 $0 Not Implemented
SF0270 # 03 Y:2003 03 2003 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $9,405 $4,145 Not Implemented
SF0270 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,226 $9,485 Implemented
SF0270 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,081 $830 Not Implemented
SF0270 # 06 Y:2003 06 2003 INSTALL SKYLIGHTS $3,975 $10,800 Implemented
SF0270 # 07 Y:2003 07 2003 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $3,034 $0 Not Implemented
SF0270 # 08 Y:2003 08 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,418 $9,500 Not Implemented
SF0270 # 09 Y:2003 09 2003 ADOPT IN-HOUSE MATERIAL GENERATION $15,179 $80,393 Not Implemented
OR0441 # 01 Y:2003 01 2003 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $65,260 $70,100 Implemented
OR0441 # 02 Y:2003 02 2003 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $18,970 $2,160 Implemented
OR0441 # 03 Y:2003 03 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $4,670 $985 Implemented
OR0441 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,900 $10,080 Implemented
OR0440 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,842,800 $348,000 Implemented
OR0440 # 02 Y:2003 02 2003 MOVE PRODUCT USING MECHANICAL MEANS $15,000 $75 Not Implemented
OR0440 # 03 Y:2003 03 2003 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,500 $5,130 Implemented
OR0440 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,500 $0 Not Implemented
OR0440 # 05 Y:2003 05 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $2,600 $700 Implemented
OR0440 # 06 Y:2003 06 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $765 $1,300 Not Implemented
OR0440 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,500 $38,200 Implemented
NC0268 # 01 Y:2003 01 2003 AUTOMATE FINISHING PROCESS $29,974 $26,350 Not Implemented
NC0268 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $9,563 $8,000 Not Implemented