IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,903

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2308 # 06 Y:2023 06 2023 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $8,204 $36,450 Not Implemented
UL2308 # 07 Y:2023 07 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,871 $15,000 Not Implemented
UD1065 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $589 $0 Not Implemented
UD1065 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,692 $430 Not Implemented
UD1065 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $38,039 $0 Not Implemented
UD1065 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $19,345 $19,667 Not Implemented
UD1065 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,046 $952 Implemented
UD1065 # 06 Y:2023 06 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $210 $741 Not Implemented
UD1065 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,980 $2,457 Implemented
UD1065 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,334 $3,051 Not Implemented
UW2310 # 01 Y:2023 01 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $29,254 $128,809 Not Implemented
UW2310 # 02 Y:2023 02 2023 UPGRADE OBSOLETE EQUIPMENT $153,154 $859,050 Not Implemented
UW2310 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,425 $1,000 Implemented
UW2310 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,210 $16,378 Implemented
SF0607 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $6,168 $0 Implemented
SF0607 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,963 $344 Implemented
SF0607 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,399 $8,086 Implemented
SF0607 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,524 $11,610 Implemented
SF0607 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,254 $13,352 Not Implemented
SF0607 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,111 $9,578 Not Implemented
SF0607 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $41,060 $346,427 Implemented
TT0300 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $46,047 $221,715 Not Implemented
TT0300 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $41,095 $32,000 Implemented
TT0300 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $22,385 $37,500 Not Implemented
TT0300 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,075 $30,000 Not Implemented