IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0751 # 02 Y:2007 02 2007 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $59,692 $201,700 Not Implemented
OK0751 # 03 Y:2007 03 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,188 $200 Not Implemented
OK0748 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $8,664 $3,013 Implemented
OK0748 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,523 $559 Implemented
OK0748 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,835 $6,840 Implemented
OK0748 # 04 Y:2007 04 2007 OPERATE BOILERS ON HIGH FIRE SETTING $22,448 $2,495 Implemented
OK0748 # 05 Y:2007 05 2007 REPAIR AND ELIMINATE STEAM LEAKS $22,467 $1,029 Implemented
OK0748 # 06 Y:2007 06 2007 INSTALL TIMERS AND/OR THERMOSTATS $34,710 $1,002 Not Implemented
OK0748 # 07 Y:2007 07 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $8,337 $8,477 Not Implemented
OK0742 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,095 $79,680 Not Implemented
OK0742 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $2,095 $3,851 Not Implemented
OK0742 # 03 Y:2007 03 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,664 $275 Implemented
OK0742 # 04 Y:2007 04 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,966 $5,529 Not Implemented
OK0742 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $2,516 $3,910 Implemented
OK0734 # 01 Y:2006 01 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,049 $15,000 Not Implemented
OK0734 # 02 Y:2006 02 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $33,532 $47,764 Implemented
OK0734 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,323 $5,175 Implemented
OK0734 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $219 $1,290 Not Implemented
OK0734 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,594 $1,150 Not Implemented
OK0734 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $237 $1,013 Not Implemented
OK0734 # 07 Y:2006 07 2006 DEVELOP A REPAIR/REPLACE POLICY $3,000 $500 Implemented
OK0721 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $486 $415 Implemented
OK0721 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,540 $7,400 Not Implemented
OK0721 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,586 $31,632 Implemented
OK0721 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,837 $13,148 Implemented