Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0751 # 02 Y:2007 | 02 | 2007 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $59,692 | $201,700 | Not Implemented |
OK0751 # 03 Y:2007 | 03 | 2007 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,188 | $200 | Not Implemented |
OK0748 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,664 | $3,013 | Implemented |
OK0748 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,523 | $559 | Implemented |
OK0748 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,835 | $6,840 | Implemented |
OK0748 # 04 Y:2007 | 04 | 2007 | OPERATE BOILERS ON HIGH FIRE SETTING | $22,448 | $2,495 | Implemented |
OK0748 # 05 Y:2007 | 05 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $22,467 | $1,029 | Implemented |
OK0748 # 06 Y:2007 | 06 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $34,710 | $1,002 | Not Implemented |
OK0748 # 07 Y:2007 | 07 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,337 | $8,477 | Not Implemented |
OK0742 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,095 | $79,680 | Not Implemented |
OK0742 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,095 | $3,851 | Not Implemented |
OK0742 # 03 Y:2007 | 03 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,664 | $275 | Implemented |
OK0742 # 04 Y:2007 | 04 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,966 | $5,529 | Not Implemented |
OK0742 # 05 Y:2007 | 05 | 2007 | INSULATE BARE EQUIPMENT | $2,516 | $3,910 | Implemented |
OK0734 # 01 Y:2006 | 01 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,049 | $15,000 | Not Implemented |
OK0734 # 02 Y:2006 | 02 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $33,532 | $47,764 | Implemented |
OK0734 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,323 | $5,175 | Implemented |
OK0734 # 04 Y:2006 | 04 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $219 | $1,290 | Not Implemented |
OK0734 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,594 | $1,150 | Not Implemented |
OK0734 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $237 | $1,013 | Not Implemented |
OK0734 # 07 Y:2006 | 07 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $3,000 | $500 | Implemented |
OK0721 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $486 | $415 | Implemented |
OK0721 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,540 | $7,400 | Not Implemented |
OK0721 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,586 | $31,632 | Implemented |
OK0721 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,837 | $13,148 | Implemented |