Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0721 # 05 Y:2006 | 05 | 2006 | INSTALL OCCUPANCY SENSORS | $289 | $1,373 | Not Implemented |
OK0721 # 06 Y:2006 | 06 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $323 | $0 | Not Implemented |
OK0703 # 01 Y:2005 | 01 | 2005 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $37,468 | $34,300 | Not Implemented |
OK0703 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,044 | $25,020 | Implemented |
OK0703 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,596 | $39,180 | Implemented |
OK0703 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,659 | $1,739 | Not Implemented |
OK0703 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,204 | $1,727 | Implemented |
OK0703 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,018 | $22,540 | Implemented |
OK0703 # 07 Y:2005 | 07 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,250 | $0 | Not Implemented |
OK0703 # 08 Y:2005 | 08 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,564 | $1,025 | Not Implemented |
OK0691 # 01 Y:2004 | 01 | 2004 | INSTALL EQUIPMENT TO MOVE PRODUCT | $90,154 | $5,782 | Not Implemented |
OK0691 # 02 Y:2004 | 02 | 2004 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $270,439 | $2,825 | Implemented |
OK0691 # 03 Y:2004 | 03 | 2004 | INSTALL SET-BACK TIMERS | $6,531 | $3,832 | Implemented |
OK0691 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,036 | $559 | Implemented |
OK0691 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $265 | $0 | Implemented |
OK0691 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $254 | $760 | Not Implemented |
OK0691 # 07 Y:2004 | 07 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $886 | $139 | Implemented |
IC0078 # 01 Y:2004 | 01 | 2004 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $41,155 | $96,800 | n/a |
IC0078 # 02 Y:2004 | 02 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,540 | $2,212 | n/a |
IC0078 # 03 Y:2004 | 03 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $9,520 | $33,750 | n/a |
IC0078 # 04 Y:2004 | 04 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,992 | $0 | n/a |
IC0078 # 05 Y:2004 | 05 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $7,304 | $900 | n/a |
IC0078 # 06 Y:2004 | 06 | 2004 | KEEP SOLID FUELS / RAW MATERIALS DRY | $1,999 | $11,950 | n/a |
IC0078 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,790 | $1,700 | n/a |
IC0078 # 08 Y:2004 | 08 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $222 | $75 | n/a |