Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
861
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0725 # 11 Y:2014 | 11 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,444 | $10,200 | Not Implemented |
MA0725 # 12 Y:2014 | 12 | 2014 | INSULATE BARE EQUIPMENT | $3,366 | $30,760 | Implemented |
MA0718 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $809 | $1,400 | Implemented |
MA0718 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,409 | $26,750 | Not Implemented |
MA0718 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $777 | $200 | Implemented |
MA0718 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,029 | $1,000 | Implemented |
MA0718 # 01 Y:2013 | 01 | 2013 | BURN WOOD BY-PRODUCTS FOR HEAT | $37,299 | $200,000 | Not Implemented |
MAS029 # 06 Y:2012 | 06 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,176 | $3,920 | Not Implemented |
MAS029 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,392 | $0 | Implemented |
MAS029 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,313 | $4,270 | Implemented |
MAS029 # 03 Y:2012 | 03 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $8,202 | $22,100 | Not Implemented |
MAS029 # 02 Y:2012 | 02 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $12,915 | $22,500 | Not Implemented |
MAS029 # 01 Y:2012 | 01 | 2012 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,149 | $500 | Implemented |
MAS027 # 03 Y:2012 | 03 | 2012 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,336 | $500 | Not Implemented |
MAS027 # 02 Y:2012 | 02 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,449 | $28,000 | Not Implemented |
MAS027 # 01 Y:2012 | 01 | 2012 | REDUCE VENTILATION AIR | $23,907 | $33,500 | Not Implemented |
MAS021 # 01 Y:2012 | 01 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $99,334 | $216,000 | Not Implemented |
MAS021 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $36,978 | $9,000 | Not Implemented |
MAS021 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $18,123 | $77,100 | Not Implemented |
MAS021 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,077 | $8,000 | Implemented |
MAS021 # 05 Y:2012 | 05 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $4,883 | $3,120 | Implemented |
MAS021 # 06 Y:2012 | 06 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,590 | $3,120 | Implemented |
MAS021 # 07 Y:2012 | 07 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,154 | $2,000 | Not Implemented |
MAS018 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $83,121 | $172,430 | Not Implemented |
MAS018 # 03 Y:2012 | 03 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $29,548 | $92,700 | Not Implemented |