Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0608 # 08 Y:2006 | 08 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $712 | $1,500 | Implemented |
SU0242 # 01 Y:2006 | 01 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $139,633 | $0 | Not Implemented |
SU0242 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,294 | $0 | Not Implemented |
SU0242 # 03 Y:2006 | 03 | 2006 | USE SYNTHETIC LUBRICANT | $7,884 | $0 | Not Implemented |
SU0242 # 04 Y:2006 | 04 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,673 | $0 | Implemented |
SU0242 # 05 Y:2006 | 05 | 2006 | INSULATE BARE EQUIPMENT | $12,811 | $4,204 | Implemented |
SU0242 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,265 | $524 | Implemented |
SU0242 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,530 | $32,632 | Implemented |
SU0242 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $849 | $1,005 | Implemented |
SU0242 # 09 Y:2006 | 09 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $126 | $632 | Implemented |
SU0242 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $67 | $432 | Not Implemented |
OR0502 # 01 Y:2006 | 01 | 2006 | RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION | $5,052,000 | $0 | Not Implemented |
OR0502 # 02 Y:2006 | 02 | 2006 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $5,700 | $0 | Implemented |
OR0502 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,300 | $6,300 | Implemented |
OR0502 # 04 Y:2006 | 04 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $18,300 | $27,500 | Implemented |
OR0502 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $12,600 | $48,600 | Implemented |
OR0502 # 06 Y:2006 | 06 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,280 | $72,900 | Implemented |
WI0522 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $69,304 | $182,880 | Implemented |
WI0522 # 02 Y:2006 | 02 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $14,000 | $3,000 | Implemented |
WI0522 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,607 | $2,000 | Implemented |
WI0522 # 04 Y:2006 | 04 | 2006 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $7,457 | $3,000 | Not Implemented |
WI0522 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,685 | $1,920 | Implemented |
WI0522 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,544 | $0 | Implemented |
WI0522 # 07 Y:2006 | 07 | 2006 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $4,560 | $12,105 | Not Implemented |
UD0750 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $273,386 | $100,000 | Not Implemented |